Item No.
U099
Setting: [B/W Level1]
1. Select an item to be set.
2. Change the setting value using the cursor left/right keys or numeric keys.l
Display
Original R1 - 3
Original G1 - 3
Original B1 - 3
Light Source R
Light Source G
Light Source B
Wait Time
*: When DP is installed.
3. Press the start key. The value is set.
Completion
Press the stop key. The screen for maintenance item No. is displayed.
U100
Setting the main high voltage
Description
Performs main charging.
Purpose
To check main charging.
Method
1. Press the start key.
2. Select [Main Charger].
3. Press the start key.
4. To stop operation, press the stop key.
Completion
Press the stop key when main charger output stops. The screen for selecting a maintenance item
No. is displayed.
Description
Description
Original threshold value for color R
Original threshold value for color G 0 to 255
Original threshold value for color B
Light source threshold value for
color R
Light source threshold value for
color G
Light source threshold value for
color B
Time from activation of the original
detection switch (ODSW) to origi-
nal size judgment
Turning the main charger on
1-3-37
Setting
range
0 to 255
0 to 255
0 to 255
0 to 255
0 to 255
0 to 255
.
2K3/2L3
Initial
setting
40/30/20
50/50/50*
40/30/20
50/50/50*
40/30/20
50/50/50*
19
49*
19
49*
19
49*
150
150*