Download Print this page

Master MP-CLR-30 Installation And Operation Manual page 8

Uf top mount water softeners

Advertisement

Electrical Requirements:
Always follow all local electrical codes when installing our water
treatment equipment.
1. Provide an 115v/60Hz properly grounded dedicated electrical
Outlet. (It's very important that the polarity be correct)
Avoid using outlets that are switch controlled.
2. Maximum amperage required is 5 amps.
3. Make sure the electrical service provides power 24 hours per day.
We recommend installing a surge protector to protect unit from
power surges, which are not covered by warranty.
Brine Tank:
1. The brine tank should be located directly beside the water softener
mineral tank.
2. Connect the 3/8" poly tubing to the 3/8" black elbow compression
fitting located on the top left side of the MCA control valve.
3/8" BRINE LINE
CONNECTION
The brine tank is equipped with a shutoff valve, the float height
See Figure Below.
was preset at the factory.
6

Advertisement

loading

This manual is also suitable for:

Mp-clr-45Mp-clr-60Mp-clr-75