Download Print this page

Master MP-CLR-30 Installation And Operation Manual page 11

Uf top mount water softeners

Advertisement

Final Check:
1. Fill the brine tank with Solar Salt and the Res-Up Feeders with Res-
Up (one quart is provided).
2. Make sure the drain line connection meets all plumbing codes and
that the drain line size can handle the backwash flow rate of the
softener.
3. Make sure the Inlet and Outlet on bypass valve are open.
4. Make sure the control valve timer is plugged into an electrical outlet
with power 24 hours per day.
5. Check all piping for leaks.
9

Advertisement

loading

This manual is also suitable for:

Mp-clr-45Mp-clr-60Mp-clr-75