Removal Of Pcb And Electrical Box - Daikin Sky Air B-Series R-410A Service Manual

Split system air conditioners
Table of Contents

Advertisement

Si21-205
3.3

Removal of PCB and Electrical Box

Procedure
Step
1. Remove the shelter.
1
Undo the five hooks
and remove the
shelter.
2. Remove the PCB.
1
Disconnect the ground
wire.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work .
Procedure
Outdoor Unit (25/35 class)
Points
The shelter has five hooks.
Be sure to avoid forgetting to
restore the shelter and to
avoid losing or damaging it.
267

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents