Final Adjustments - Cub Cadet 828 SWE Operator's Manual

Two-stage snow thrower
Table of Contents

Advertisement

IMPORTANT: Prior to operating your snow thrower, refer
to "Testing Auger Drive Control" later in this section.
Read and follow all instructions carefully and perform
all adjustments to verify your snow thrower is operating
safely and properly.
4. Remove lock nuts and screws securing one of the
flange keepers to the chute assembly. Loosen the
fasteners of the other two flange keepers.
5. Place chute assembly onto chute base as shown in
Figure 3-4. Make sure that the chute notches engage
with the spiral end of chute directional control, and
the two flange keepers are beneath the flange on the
chute base.
6. Secure flange keeper removed earlier with lock nuts
and screws. Tighten down nuts securing the other two
flange keepers. See Figure 3-5.
7. Check that the chute cables are properly routed
through the cable guide on top of engine shroud. See
Figure 3-6.
The extension cord is fastened with a cable tie to the rear
of the auger housing for shipping purposes. Cut the cable
tie and remove it before operating the snow thrower.
Shear Pin Storage
Holes are located in the plastic dash panel for convenient
shear pin storage. See Figure 3-7.

Final Adjustments

Make these final assembly adjustments before operating
your snow thrower for the first time. Failure to follow these
instructions may cause damage to the snow thrower.
Figure 3-
Chute Base
Flange
Figure 3-4
Figure 3-
Cable
Chute
Guide
Cables
Figure 3-6

3
Setting Up
Your Snow
Thrower
IMPORTANT
Prior to operating
your snow thrower,
refer to Auger Control
Test in the Operation
section. Read and
follow all instructions
carefully and perform
all adjustments to verify
your snow thrower is
operating safely and
properly.

Advertisement

Table of Contents
loading

Table of Contents