Fill System; Water Valve Assembly; Water Valve Strip Circuit; Water Valve Tests - GE GFWS2500 Technical Service Manual

Louisville built front load washer
Table of Contents

Advertisement

Water Valve Assembly

Cold Solenoid
Steam Solenoid
Hot Solenoid
Operating Voltage: 120 VAC
Resistance: 1 kΩ each valve
Location: See Water Valve Assembly Location on
page 35.
The steam valve part of the water valve assembly
is a low fl ow water valve used during steam cycles.
Steam is created by heating a small amount of
water in the sump.
The fl ow meter is built into the water valve assem-
bly and cannot be replaced separately. It is used to
monitor fi ll rate and keep a cumulative count of the
amount of water that has entered the washer. The
fl ow meter consists of a hall senor and water paddle
that has 2 embedded magnets. Water fl ow causes
the paddle to rotate. As the paddle rotates, the
magnets of the paddle interact with the hall senor
which generates a pulse train to the IMC board.

Fill System

Switched L1
Switched L1
Switched L1
To Neutral

Water Valve Tests

• Enter service mode.
• Run Test 04 for the hot water valve.
• Run Test 25 for the steam water valve.
• Run Test 06 for the cold water valve.

Water Valve Removal

1. Disconnect power and water supply to unit.
2. Remove the control panel. (See Control Panel
Removal)
3. Remove the top panel. (See Top Panel Removal)
4. Disconnect the water valve wire harnesses.
5. Remove the 1/4" hex head water valve screw.
6. Slide water valve assembly slightly to the left
and pull it toward the inside of the washer to
remove.
59

Water Valve Strip Circuit

IMC J702-1
IMC J702-3
IMC J702-2
IMC J101-4
1/4" Hex
H
S
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents