Installation; Inspection Of Unit; Unpacking The Cabinet; Ups Setup - Orion Network Pro 1500 RTX User Manual

Line interactive ups
Table of Contents

Advertisement

3. Installation

3.1 Inspection of Unit

Inspect the UPS upon receiving. If the UPS is apparently damaged during the shipment, please keep the box and
packing material in original form for the carrier and notify the carrier and dealer immediately.

3.2 Unpacking the Cabinet

To unpack the system:
1. Open the outer carton and remove the accessories packaged with the cabinet.
2. Carefully lift the cabinet out of the outer carton and set it on a flat, stable surface.
3. Discard or recycle the packaging in a responsible manner, or store it for future use.

3.3 UPS Setup

All model series are designed for tower and rack purpose. They can be installed into a 19 inches equipment rack.
Please follow the instruction for Tower Setup and Rack-Mount Setup.
 Tower setup
This series of UPS can be placed horizontally and vertically. As a tower configuration, it is provided with the optional
UPS stands to stabilize the UPS when the UPS is positioned in vertical. The UPS stand must be attached to the
bottom of the tower.
Use the following procedure to install UPS in UPS stands.
1. Hold the UPS vertically and put two UPS stands at each end of the tower.
2. Place down the UPS into two stands carefully.
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Network pro 2200 rtx

Table of Contents