1.4 Switches and Panel Indicators

(1)
Power switch: Press the "On/Mute"
switch the UPS on. Press the "Off"
switch the UPS off.
(2)
AC INPUT indicator (Green): When this indicator lights up, the power
mains input is normal.
(3)
BATTERY indicator (Yellow): When this indicator lights up, the UPS is
powered by the battery pack.
(4)
BYPASS indicator (Yellow): When this indicator lights up, the UPS unit is
supplying power of the Power Mains to the output via bypass.
(5)
UPS ON indicator (Green): When this indicator lights up, the UPS is
supplying power to the output through the inverter.
(6)
Fault indicator (Red): In case of any anomaly of the UPS, this indicator
lights up and a continuous audio alarm sounds.
(7)
Load capacity indicators (4 green lamps and 1 yellow lamp) or battery
capacity indicators (5 green lamps): Number of lit lamps indicates the
percentage of load or battery capacity. Designation of indicators is as
follows: (from left to right as in the following diagram of indicators on the
panel.)
button on the front panel to
button on the front panel to
6

2. Installation and Operation

2.1 Unpacking and Inspection

In case of any damage of the carton package, please contact the shipper
immediately. For the purpose of further shipment or storage, please place
the packaging material in the carton and store them properly.
2.2 RACK
Installation
2.2.1 Slide Rail Accessories include:
Item
Quantity
Front rail
2
Rear rail
2
Inner rail
2
M4 * 8mm screw
16+16
M4 nut
8
M5 * 16mm screw
12
Handle
2
2.2.2 Device box bracket
assembly process:
(1) Adjust the front and rear sliding
rails to the same length as the
RACK, fix the front and rear ends
of the slide rails to the RACK
using 8 M5 bolts, as shown in
Fig.1.
(2) Lock the front rails and the rear
rails using 8 M4 bolts and 8 M4
nuts as shown in Fig.2.
(3) Fix the handle and inner rails to
both sides of the RACK using 16
M4 bolts, with the lock latch on
the inner rail facing the rear of
the RACK, as shown in Fig.3.
RACK
M5 bolt
Front
front rail
rail
bracket
Rear
rail
RACK rear
rail bracket
M5 bolt
Fig. 1
M4 Nut
M4 Bolt
M4 Nut
Fig. 2
Inner rail
M4 bolt
Latch
UPS Rack
Front panel
Handle
M4 bolt
Fig. 3