International comfort products N9MP1 Installation Instructions Manual page 8

90+ single stage, category iv, gas furnace
Hide thumbs Also See for N9MP1:
Table of Contents

Advertisement

Figure 3
Dimensions & Clearances
TOP
LEFT SIDE
TRAP (KO) (COUNTERFLOW)
GAS
VENT
AIR INTAKE (KO)
(ALTERNATE)
13
4
/
16
(122.2)
TRAP (KO)
UPFLOW/HORIZONTAL
THERMOSTAT
1
(57.2)
2
/
4
1
13
/
4
(336.6)
(KO)
5
21
/
8
(549.3)
7
1
/
8
24
(47.6)
(609.6)
BOTTOM
D
1
23
/
C
8
(587.4)
Cabinet
Unit
A
B
Capacity
C
1
3
15
/
14
1
/
2
N9MP1040/050B^^
(394)
(356)
(35)
1
3
15
/
14
1
/
2
N9MP1060/075B^^
(394)
(356)
(35)
1
5
1
19
/
17
/
2
/
8
8
N9MP1080/100F^^
(486)
(448)
(54)
3
1
15
22
/
21
/
1
/
4
4
N9MP1100/125J^^
(578)
(540)
(49)
1
3
15
/
14
1
/
2
N9MP2050/075B^^
(394)
(356)
(35)
1
5
1
19
/
17
/
2
/
8
8
N9MP2080/100F^^
(486)
(448)
(54)
3
1
15
22
/
21
/
1
/
4
4
N9MP2100/125J^^
(578)
(540)
(49)
1
5
1
19
/
17
/
2
/
8
8
N9MPD040/050F^^
(486)
(448)
(54)
1
5
1
19
/
17
/
2
/
8
8
N9MPD060/075F^^
(486)
(448)
(54)
3
1
15
22
/
21
/
1
/
4
4
N9MPD080/100J^^
(578)
(540)
(49)
1
7
24
/
23
/
2
16
N9MPD125L^^
(622)
(584)
(11)
1
5
1
19
/
17
/
2
/
8
8
*9MPD050/075F^^
(486)
(448)
(54)
3
1
15
22
/
21
/
1
/
4
4
*9MPD080/100J^^
(578)
(540)
(49)
1
7
24
/
23
/
2
16
*9MPD125L^^
(622)
(584)
(11)
*
Denotes Brand
^^
Cooling Air Flow
8
F
AIR INTAKE
VENT (N9MPD & *9MPD)
H
G
E
11
6
/
ELECTRICAL
16
1
1
/
(177.5)
4
(32)
1
(27)
1
/
16
11
13
/
16
(347.7)
11
31
/
16
(804.9)
3
1
/
8
(34.9)
7
29
/
8
(758.8)
3
28
/
7
4
(730.3)
(177.8)
1
24
/
16
(611.2)
13
5
19
/
17
/
16
16
(503.2)
(439.7)
11
1
/
16
(42.9)
7
4
/
8
(123.8)
ALL DIMENSIONS − IN(MM)
1 in = 25.4 mm
7
3
/
8
(98.4)
Bottom
Top
G
H
D
E
F
5
12
/
8
8
--
--
--
--
(321)
5
12
/
8
8
--
--
--
--
(321)
3
14
/
8
4
--
--
--
--
(375)
3
18
/
16
4
--
--
--
--
(476)
5
1
3
12
/
4
/
7
/
8
8
2
--
--
(321)
(114)
(197)
3
1
1
14
/
4
/
9
/
8
4
2
--
--
(375)
(114)
(241)
3
1
3
18
/
4
/
11
16
4
2
--
--
(476)
(114)
(289)
3
3
1
1
1
14
/
4
/
4
/
2
/
9
/
8
4
8
2
2
(375)
(111)
(114)
(64)
(241)
3
3
1
1
1
14
/
4
/
4
/
2
/
9
/
8
4
8
2
2
(375)
(111)
(114)
(64)
(241)
3
3
1
5
3
18
/
4
/
4
/
2
/
11
16
4
8
2
8
(476)
(111)
(114)
(67)
(289)
3
1
1
1
23
4
/
4
/
2
/
12
8
2
4
(584)
(111)
(114)
(57)
(311)
3
3
1
1
1
14
/
4
/
4
/
2
/
9
/
8
4
8
2
2
(375)
(111)
(114)
(64)
(241)
3
3
1
5
3
18
/
4
/
4
/
2
/
11
16
4
8
2
8
(476)
(111)
(114)
(67)
(289)
3
1
1
1
23
4
/
4
/
2
/
12
8
2
4
(584)
(111)
(114)
(57)
(311)
Drawing is representative, but some models may vary
Specifications are subject to change without notice
COMBUSTIBLE MATERIALS FOR ALL UNITS
REAR
FRONT (combustion air openings
in furnace and in structure)
Required For Service
A
ALL SIDES Of SUPPLY PLENUM
B
SIDES
VENT
TOP OF FURNACE
FRONT
*
30" (762mm) clearance recommended for furnace removal.
Horizontal position: Line contact is permissible only between
lines formed by intersections of top and two sides of furnace
jacket, and building joists, studs or framing.
NOTE: Evaporator "A" coil drain pan dimensions may
vary from furnace duct opening size. Always consult
evaporator specifications for duct size
requirements.
Furnace is designed for bottom return or side
return.
Return air through back of furnace is NOT allowed.
1
1
/
4
(31.7)
7
2
(73)
3
(60)
2
/
8
1
(27)
1
/
16
GAS
3
1
/
16
13
4
/
(30)
16
(122)
4
11
(43)
1
/
16
7
2
29
/
8
(759)
/
3
8
27
/
16
(691)
13
9
/
16
5
21
/
8
2
(251)
(549)
5
11
33
/
17
/
16
16
2
(440)
(856)
11
1
/
16
(43)
/
8
/
4
2
/
8
/
KO = KnockOut
4
MINIMUM CLEARANCES TO
/
8
1
28
/
(724)
2
1
18
/
5
4
/
2
16
(470)
(110)
RIGHT SIDE
TRAP (COUNTERFLOW)
ELECTRICAL (KO)
AIR INTAKE (KO)
(ALTERNATE)
VENT (KO)
TRAP (KO)
UPFLOW/HORIZONTAL
7
1
(57)
2
/
(178)
4
THERMOSTAT
1
19
/
4
(489)
(KO)
7
4
/
5
8
21
/
8
(124)
(549)
24
(610)
0
3" (76.2)
*
24" (609.6)
1" (25.4)
0
0
1" (25.4)
3
/
4
(19)
TYP.
40
(1016)
7
1
/
8
(48)
25−23−36b
440 01 1024 04

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mpdC9mpdH9mpdT9mpdN9mp2

Table of Contents