International comfort products N9MP1 Installation Instructions Manual page 20

90+ single stage, category iv, gas furnace
Hide thumbs Also See for N9MP1:
Table of Contents

Advertisement

Figure 12
Upflow Installations Vent through Left−Side
Plastic Cap
Yellow or black
Coupling & Clamps
(Optional)
Either: The PVC
Drain Tee or a field
Vent Drain
supplied 2,
& Clamps
(50.8mm) PVC Tee
Dual Pressure Switch Detail
Drain Connector Black PVC
, (19.1mm) PVC X
3
/
4
(12.7mm) CPVC
(Loose parts bag)
Casing Grommet
Black Rubber
, (15.9mm) ID
5
/
8
(Loose parts bag)
, (18.1mm) PVC or
3
Drain Line Vent Tee
/
4
(12.7mm) CPVC (Field supplied)
Upflow Installations Vent through Left−Side
Remove drain tee from inducer discharge and remove black drain
1
tube
/
" (12.7mm) ID from bottom of drain tee. (N9MPD and
2
*9MPD models only)
Install Vent Pipe grommet in side of casing.
Cut an appropriate length of 2" (50.8mm) PVC pipe long enough
to exit the cabinet and connect the vent drain to either:
• A standard field supplied 2" (50.8mm) PVC tee (N9MP1 or
N9MP2 models), or
• A 2" (50.8mm) PVC coupling fastened onto the drain tee
(N9MPD and *9MPD models)
Install tee trap into bottom of tee.
Remove knockout from the side of the furnace casing where drain
tube will exit.
1
Install the
/
" (12.7mm) CPVC street elbow on discharge of trap
2
20
2, (50.8mm) PVC
Coupling
Tee Trap White PVC
(loose parts bag)
Drain Tube
Black Rubber
, (12.7mm) ID
1
/
2
& Clamps
Drain Tube
,
1
/
Corrugated
2
, (15.9mm) ID
5
/
8
& Clamps
,
1
/
2
Representative drawing only, some models may vary in appearance.
Specifications are subject to change without notice
On Some Models
ONLY
V E
NT
ON
OFF
(See Figure 12)
Install the black PVC drain connector [
CPVC from loose parts bag] as shown in the illustration above.
Cut the black drain tube [
length to fit between trap and tube connector through grommet.
Clamp both ends of the drain tube using clamps provided.
Glue the CPVC street elbow to the trap using appropriate cleaner
and solvent cement.
Connect the tee trap and the main drain line exiting the casing as
shown in Figure 20.
Note:
It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Both
the internal trap and the external tee trap must be primed
before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.
Single Pressure Switch
Relief Tube
3
Black Rubber
/
16
(4.8mm) ID
SIDE VIEW
Rotate downward
55 to 105
NOTE: Built-in channel will
be angled 5° to 10° also.
25−24−81
3
/
" (19.1mm) PVC x
4
5
/
" (15.9mm) ID − in loose parts bag] to
8
440 01 1024 04
,
1
/
"
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mpdC9mpdH9mpdT9mpdN9mp2

Table of Contents