International comfort products N9MP1 Installation Instructions Manual page 3

90+ single stage, category iv, gas furnace
Hide thumbs Also See for N9MP1:
Table of Contents

Advertisement

(This sheet is optional. Keep this page for future reference.)
Date of Start−Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete
All Electrical Connections Tight?
Have hoses been relocated for furnace application
(upflow/horizontal)?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut−Off Upstream of Furnace/Drip−Leg?
Gas Valve turned ON?
Type of Gas:
Natural:
Filter Type and Size:
3
START−UP CHECK SHEET
For 90+ Furnace
Propane:
Specifications are subject to change without notice.
Calculated Firing Rate:(See Checks and Adjustments
Section).
Heating Check
Measured Line Pressure when Firing Unit:
Measured Manifold Gas Pressure:
Temperature of Supply Air:
Temperature of Return Air:
Temperature Rise (supply−return temperature): (°)
In Rise (see furnace rating plate)?
Static Pressure (Ducts): Supply Air
Which blower speed tap is used? (Heating)
Optional Check: CO ?
Cooling Check
Temperature of Supply Air:
Temperature of Return Air:
Temperature Difference:
Static Pressure (Ducts) cooling: Supply Air
Blower Speed Tap used for cooling:
Dealer Comments:
(°)
(°)
(°)
Return
CO2 ?
(°)
(°)
(°)
Return
_______
440 01 1024 04

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mpdC9mpdH9mpdT9mpdN9mp2

Table of Contents