SECTION 7 − SETTING SEQUENCE PARAMETERS
7-1. Sequence Parameters In A Program
1. Preflow
2. Run-In
3. Start
4. Weld
5. Crater
6. Burnback
7. Postflow
X = Setting available.
Preflow
Time
Preflow
Trigger
Pressed
SECTION 8 − SETTING DUAL SCHEDULE PARAMETERS
8-1. Optional Dual Schedule Switch Diagrams
Dual Schedule With DSS-9
(Maintained Contact)
1
2
A
B
Sequence
Volts
X
X
X
X
Weld Time
Start
Time
Run-In
Start
Weld
1
2
3
4
Parameters
IPM
Seconds
0-9.9
X
X
0.00-5.00
X
0-100.0
X
0-5.00
0-0.25
0-9.9
Crater
Time
Burnback
Crater
Postflow
Trigger
Released
Dual Schedule With DSS-8
(Maintained Contact)
1
2
TR
3
B
A
4
.
For more information on
Sequence Push Button see
Section 6-11.
If time is set to zero in Weld
sequence, welding continues until
gun trigger is released.
If time is set to zero in any timed
sequence
except
sequence is skipped.
Burnback
Time
Postflow
Time
Time
Sequence
End
.
A DSS-8 will not function with
trigger hold and dual schedule.
A DSS-9 is recommended for
this application.