Repair Schedule; Service Schedule - Gaggia Anima Service Manual

Table of Contents

Advertisement

GAGGIA ANIMA
6.1.

Repair schedule

Action
1
Visual inspection (transport damage)
2
Machine data check (rating plate)
3
Operational check / problem analysis
4
Opening machine
5
Visual inspection
6
Operational tests
7
Repairing the faults encountered
8
Checking any modifi cations (view Symptom Cure, new software, etc.)
9
Service activities in accordance with the operating schedule
10 Internal cleaning
11 Operational test while the appliance is open
12 Assembly
13 Final inspection test
14 Draining the circuit (in winter)
15 External cleaning
16 Lubricating the brewing unit with suitable grease
17 Insulation test HG 701 (dielectric)
18 Documentation
6.2.

Service schedule

S
Replacement
ES Visual inspection
D
Descaling
Component
Water fi lter
Water tank lip seal
Boiler pin O-ring
Brewing unit
Hoses, attachments and Oetiker clamps
Pump
Gear motor
Coffee grinder
Water circuit
Hot water/steam valve
P
Cleaning
TR
Noise test
R
Adjustment
Action
P/S
S
S
ES/P
ES
ES/TR
ES/TR
P/R
D
ES/S
06 STANDARD CHECKS
Support/tool
Grease solvent / Grease
Vacuum cleaner / brush
Saeco descaler
Pag. 1/2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Anima xl

Table of Contents