Sign In
Upload
Manuals
Brands
Unipower Manuals
Power distribution unit
Sageon II
Unipower Sageon II Manuals
Manuals and User Guides for Unipower Sageon II. We have
2
Unipower Sageon II manuals available for free PDF download: Product Manual
Unipower Sageon II Product Manual (131 pages)
Brand:
Unipower
| Category:
Power distribution unit
| Size: 8.1 MB
Table of Contents
Table of Contents
5
1 Introduction
11
Figure 1-1 Sageon2.L24; 200A, 1 Tier Distribution
11
Figure 1-2 Sageon2.L25; 200A, 1 Tier Distribution with Ac Breakers
12
Figure 1-3 Sageon2.L26; 200A, 2 Tier Distribution
12
Figure 1-4 Sageon2.L27; 200A, 2 Tier Distribution with Ac Breakers
13
Product Description
13
Figure 1-5 Simplified Block Diagram, 48V Sageon 200A
15
19" Sageon 200A Physical Specifications (1 Tier)
16
23" Sageon 200A Physical Specifications (2 Tier)
16
Sageon 200A Environmental Specifications
17
Sageon 200A Electrical Specifications
17
General Specifications
17
Bus Specifications
17
EMC Specifications
18
Rectifier Specifications
19
Safety Specifications
20
Monitoring Specifications
20
Alarm Specifications
20
Specifications
16
Product Support
21
2 Installation
23
Installation Summary
23
Reference Material
24
Tools and Accessories
24
Selecting and Sizing Copper DC Power Cables
24
Table 2-1 Wire Sizing
25
Torque Specifications
26
Selecting a Location
26
Table 2-2 Torque Specifications, Steel Fasteners
26
Connecting Ac Power to the Sageon 200A
27
Sageon 200A Connections to Ground
27
Lightning and Transient Suppression
28
User's AC Electrical Service Panel
28
Figure 2-1 Return Bus Location
28
AC Input Cabling
29
Table 2-3 Circuit Breaker Selection, Ac Power
29
Figure 2-2 Typical Ac Input & Battery Connection (L26 Shown)
30
Figure 2-3 Rectifier Breaker Location
30
Rectifier Position Address
31
Connecting Battery Cables
32
Connecting Customer Loads
33
Figure 2-4 DC Output Bus (Load) Locations (2 Tier Shown)
33
Connecting External Alarm Annunciators
34
Battery Temperature Sensors and Kits (Option)
34
Figure 2-5 Relay Interface Board, Customer Connections
34
Figure 2-6 Temperature Concentrator Board
35
Figure 2-7 Battery Connections
35
Table 2-4 Battery Temperature Sensor Connections
36
Installing a Battery Current Transducer (Option)
37
Figure 2-8 Temperature Sensor Location
37
Sageon Battery Monitor (Option)
38
Figure 2-9 Typical Battery Current Transducer
38
Table 2-5 Battery Current Transducer Connections
38
Site Monitor System (Option)
39
Communications
39
Installing and Removing Rectifiers
39
Figure 2-10 Rectifiers
39
Configuration
41
General Description
41
Figure 2-11 Rear View of Connections
41
Figure 2-12 Connections on Controller Backplane
42
3 Commissioning
43
Preparation
43
Commissioning a System
43
Mounting the Power Module
45
Gaining Access to Rear Wiring
45
Overview of External Wiring Connections
45
Figure 3-1 Mount Points for Securing Power Module in a Rack
45
Figure 3-2 Typical Sageon 200A Internal Schematic Diagram (Sheet 1 of 3)
46
Figure 3-3 Continue Typical Sageon 200A Internal Schematic Diagram (Sheet 2 of 3)
47
Figure 3-4 Continue Typical Sageon 200A Internal Schematic Diagram (Sheet 3 of 3)
48
Factory Supplied Configurations
49
Single Phase - Individual Protected External Feeds
49
Figure 3-5 Customer Ac Feed Terminals
49
Figure 3-6 Single Phase Feed (Phase to Neutral)
50
Figure 3-7 Single Phase Feed (Phase to Phase)
50
Figure 3-8 Split Single Phase Feed (Phase to Neutral)
51
Figure 3-9 Y-Three Phase Feed -Connected Rectifiers (Phase to Phase)
51
Figure 3-10 Y-Three Phase Feed (Phase to Neutral)
52
Figure 3-11 -Three Phase Feed (Phase to Phase)
52
Figure 3-12 Y-Three Phase Feed; Single Phase to Recifiers
53
Figure 3-13 Y-Three Phase Feed; Single Phase to Rectifiers
53
Surge Protection Requirements
54
Temperature Sensors
54
Figure 3-14 Surge Protection
54
Auxiliary Relay Connections
55
Controller Power Connections
55
Figure 3-15 Communication Interface Board (Opt) & Multiple Alarm Board
55
Front Panel Usb Communications Connection
56
Remote Communication Connection
56
TCP/IP and Sageview Interfaces
56
Battery Distribution Module Interface
57
Figure 3-16 Battery Distribution Module (Bdm) Interface
57
Adding Auxiliary Expansion Modules (Sageon Battery &/Or Site Monitor)
58
Figure 3-17 Auxillary Board
58
4 Configuration and Operation
59
Table 4-1 Summary of Default System (Scu) Parameters
59
The "Home" Screen
61
Using the Operator Panel Push Buttons
61
Figure 4-1 Operator Panel
61
Reading the Operator Panel System Status Leds
63
Reading Alarm Messages
63
Table 4-2 Reading Operator Panel System Status Leds
63
Table 4-3 Operator Panel Annunciated Alarm Messages
64
Home Menu Screens
65
Sageon Battery Monitor
69
Site Monitor
70
Rect (Rectifier) Menu Screens
70
Batt Menu Screens
72
Battery Temperature Compensation
74
Equalization
75
Battery Low Voltage Disconnect (BLVD)-(LVLD Screens)
76
Battery Discharge Test Screens
76
BDT Results Screen
78
BDT Results Screen, Additional Details
78
BDT Disabled
78
Alarm Log Screens
79
Sageon Battery Monitor Setup
79
Table 4-4 Sbm Boards Needed for Various Battery Configurations
79
Battery Cell Measurements
80
Frequency of Measurement
80
Commissioning
80
Operation
81
Summary of Controller Front Panel Controls
81
5 Sageview
82
Configuration
82
Sageview Benefits
82
Figure 5-1 Network Connections
82
Monitoring
83
Security
83
Cable and Network Connections
83
Local Connection, Standard
83
Remote Connection, Ethernet, Option
83
Pc Requirements
83
Installing Sageview
84
Operating Sageview
86
Main Screen
87
Figure 5-2 System Status Screen
87
Initial Settings
88
Password - Remote PC
88
Access Code - Local PC
88
Communications
89
Configuration
91
Create a New Configuration
91
Figure 5-3 Scu Parameters Dialog Box
92
Figure 5-4 Rectifier Parameter Dialog Box
92
Edit an Existing Configuration
93
Figure 5-5 Site Monitor Dialog Box
93
Controller Components
94
Alpha-Numeric Display
94
Front Panel Pushbuttons
95
Status Indicating Leds (Controller)
95
Controller Security & Alarms
95
Password Security
95
Entering a Password to Gain Access to Parameters Change
95
When an Alarm Condition Exists
96
Controller Alarms
96
User Programmable Relay Functions
97
Navigating Controller Functions
98
Base Menu (System Level Functions)
98
Rectifier Menu (Rectifier Specific Functions)
101
Alarm Log
101
Battery Menu (Battery Specific Functions)
102
6 Maintenance
104
Circuit Board Handling
104
Periodic Maintenance
104
Troubleshooting
105
Reading Rectifier Status Led Codes
105
Table 6-1 Alarm Messages and Error Codes
105
Table 6-2 Rectifier Led Codes
105
Component and Bus Locations
106
Figure 6-1 Output Bus Connections
106
Replacing a Rectifier
107
Replacing the Sageon 200A Control Unit (Scu)
107
Configuration Considerations
107
Figure 6-2 Circuit Board Locations
107
Replacing a Rectifier Back Plane Board
108
To Remove a Rectifier Module or a Controller
111
To Insert a Rectifier Module or a Controller
111
7 Spare and Replacement Parts
112
Table 7-1 Parts List
112
8 Setting up Network Interfaces
113
Programming Ip Addresses Using Device Installer Software
113
Preparations for Local Address Set up
113
Local IP Address Set up Procedure
113
Preparations for Gateway Address Set up
114
Gateway IP Address Set up Procedure
114
Programming Ip Addresses Using Arp and Telnet Access
115
Preparations for Local Address Set up
115
Local IP Address Set up Procedure
115
Configuring the Unit
116
Using a Telnet Connection
116
Server Configuration (Network Configuration)
117
Advertisement
Unipower Sageon II Product Manual (45 pages)
Brand:
Unipower
| Category:
Power distribution unit
| Size: 1.51 MB
Table of Contents
Table of Contents
6
General Warning
9
Configuration
11
General Description
11
System Description
11
Front View
11
Figure 2-1 400A Bulk Power
11
Figure 2-2 600A Bulk Power
11
Figure 2-3 400A Bulk Power with AC Breakers
12
Figure 2-4 600A Bulk Power with AC Breakers
12
Rear View
13
Figure 2-5 Rear View of Connections
13
Figure 2-6 Connections on Controller Interface Board
13
Figure 2-7 Alarm Relay Board Connections
14
Installation
15
Mounting the Power Module
15
Tools Required for Installation
15
Gaining Access to Rear Wiring
15
Overview of External Wiring Connections
15
Figure 3-1 Mount Points for Securing Power Module in a Rack
15
Mains Connections
16
Factory Supplied Configurations
16
Single Phase - Individual Protected External Feeds
16
Figure 3-2 AC Feed Terminations
16
Figure 3-3 Single Phase Feed (Phase to Neutral)
17
Figure 3-4 Single Phase Feed (Phase to Phase)
17
Figure 3-5 Split Single Phase Feed (Phase to Neutral)
18
Figure 3-6 Y-Three Phase Feed -Connected Rectifiers (Phase to Phase)
18
Figure 3-7 Y-Three Phase Feed (Phase to Neutral)
19
Figure 3-8 -Three Phase Feed (Phase to Phase)
19
Figure 3-9 Y-Three Phase Feed; Single Phase to Rectifiers (Phase to Phase)
20
Figure 3-10 Y-Three Phase Feed; Single Phase to Rectifiers (Phase to Neutral)
20
Surge Protection Requirements
21
Bulk Load Connections
21
Battery Connections
21
Figure 3-11 Surge Protection
21
Figure 3-12 Bulk Load Connections
21
Temperature Sensors
22
Auxiliary Relay Connections
22
Figure 3-13 Communication Interface Board (Opt) & Multiple Alarm Board
22
Controller Power Connections
23
Front Panel Usb Communications Connection
23
Remote Communication Connection
23
TCP/IP and Sageview Interfaces
23
Ac Option Box (List 41 & 61)
24
Adding Auxiliary Expansion Modules
24
Figure 3-14 AC Option Box Rear View (Screens Removed for Clarity)
24
Commissioning
25
Operation
27
Summary of Controller Front Panel Controls
27
Controller Components
27
Alpha-Numeric Display
27
Front Panel Pushbuttons
27
Status Indicating Leds (Controller)
28
Controller Security & Alarms
28
Password Security
28
Entering a Password to Gain Access to Parameters Change
28
When an Alarm Condition Exists
28
Controller Alarms
29
User Programmable Relay Functions
30
Navigating Controller Functions
31
Base Menu (System Level Functions)
31
RECTIFIER Menu (Rectifier Specific Functions)
34
Alarm Log
34
Battery Menu (Battery Specific Functions)
35
Troubleshooting
37
To Remove a Rectifier Module or a Controller
39
To Insert a Rectifier Module or a Controller
39
Figure 6-1 Removing Rectifier Module or Controller
39
Appendix A - Setting up Network Interfaces
41
Programming Ip Addresses Using Device Installer Software
41
Preparations for Local Address Set up
41
Local IP Address Set up Procedure
41
Preparations for Gateway Address Set up
41
Gateway IP Address Set up Procedure
41
Programming Ip Addresses Using Arp and Telnet Access
42
Preparations for Local Address Set up
42
Local IP Address Set up Procedure
42
Configuring the Unit
43
Using a Telnet Connection
43
Server Configuration (Network Configuration)
44
Specifications for 110-7670-4850
45
Advertisement
Related Products
Unipower SAGEON VIGIL
Unipower Sageon PSMC I
Unipower Sageon Micro Power Module
Unipower Sageon III
Unipower Sageon II Bulk
Unipower SLI 15
Unipower DPB1U SERIES
Unipower DPBF1U Series
Unipower DPG1U SERIES
Unipower DPGF1U Series
Unipower Categories
Power Supply
Power distribution unit
Inverter
Battery Charger
Measuring Instruments
More Unipower Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL