Sign In
Upload
Manuals
Brands
Traub Manuals
Industrial Equipment
TNL20
Traub TNL20 Sliding Headstock Lathe Manuals
Manuals and User Guides for Traub TNL20 Sliding Headstock Lathe. We have
2
Traub TNL20 Sliding Headstock Lathe manuals available for free PDF download: Operating Instructions Manual
Traub TNL20 Operating Instructions Manual (110 pages)
Brand:
Traub
| Category:
Industrial Equipment
| Size: 6 MB
Table of Contents
Table of Contents
3
Preface
7
General Notes
7
Safety Instructions
8
Service Interval - Care Activities
11
Maintenance Summary - Care Activities
12
AL010 - Check the Work Area Door and Window Pane
13
AL011 - Clean the Guide Rail/Gutter at the Work Area Door
15
AL046 - Check Pneumatic Unit (Visual Inspection)
16
AL050 - Check the Filter Mat of the Main and Counter Spindle Cooling, Clean if Necessary
18
AL095 - Visual Inspection of All Fluid Lines and Electrical Cables
19
AL120 - Check Cooling Lubricant (Visual Inspection)
20
AL147 - Check Work Area Light (Visual Inspection)
22
AL165 - Clean and Check All Telescopic Covers and Telescopes of the Tool Carriers
23
AL166 - Check Central Lubrication System
24
AL167 - Clean and Lubricate Clamping Device
25
AL168 - Pneumatic Clamping Device, Clamping Without Collet
27
AL171 - Clean Covers and Wipers
28
AL180 - Clean the Work Area
29
AL190 - Transition from Work Area to Coolant/Oil Mist Extraction System
30
AL240 - Clean the Chip Pan
31
AL266 - Clean the Chip Conveyor
34
AL310 - Lubricate All Linear Axes by Moving the Axes
35
Service Interval - 2.000 Operating Hours
37
Maintenance Summary - 2.000 Operating Hours
38
CL010 - Check Maintenance Logs of Servicing Activities
39
CL020 - Clean and Check Wipers and Guide Rails of the Work Area Door
40
CL035 - Check Work Area Door (Optionally with Electr. Drive) and Window Pane
43
CL076 - Checking Outer Wipers of Roller Guides on the "Workpiece Removal Unit to the Left
47
CL500 - Perform Data Backup
48
CL520 - Check Control Cabinet
49
Service Interval - 4.000 Operating Hours
51
Maintenance Summary - 4.000 Operating Hours
52
DL010 - Cleaning of the Machine
53
DL015 - Check Shutters for Function and Auto Stop
55
DL030 - Check Coolant
57
DL050 - Check Central Lubrication Unit
59
DL055 - Check Pneumatic Unit
61
DL070 - Check Power Clamping Device for Dog Clamping
64
DL071 - Check Pneumatic Clamping Device with Wedge Gear
66
DL075 - Check the Cycloidal Gear on the Turret and the Front Working Attachment
67
DL080 - Check the Seals on the Rotary Distributor of the Turret and the Front Working Attachment, Replace if Necessary
68
DL160 - Determine Axis Ballscrew Backlash
69
DL170 - Axes
71
DL180 - Check Fire Protection System (Visual Inspection)
72
DL225 - Replace Toothed Belts and Check Belt Tension
73
DL480 - Check Wipers on the Trolleys of the Workpiece Removal Unit and Replace Them, if Necessary
75
DL490 - Replace the Wiper and Telescopic Plates
76
DL491 - Clean Drain Holes at the Z Cover of the Upper Tool Carrier
80
DL492 - Replace the Wiper for Fixed Headstock Operation on the Main Spindle
81
DL510 - Perform Data Backup
82
DL520 - Check Control Cabinet and Cable Assemblies (Visual Inspection)
83
DL525 - Check the Fan and Fan Cover in the Control Cabinet, Clean if Necessary
85
DL590 - Check Inspection/Replacement Date of the Backup Batteries in the Control Cabinet (NC)
86
DL636 - Check the Replacement Interval of the Servo Backup Batteries at the Axis Servos
88
Service Interval - 8.000 Operating Hours
91
Maintenance Summary - 8.000 Operating Hours
92
EL010 - Check the Dog Clamping Fixture, Replace if Necessary
93
EL020 - Check Pneumatic Clamping Device with Wedge Gear, Replace if Necessary
95
EL030 - Check Automatic Work Area Door with Xcenter (Option)
96
Service Interval - 5 Years
99
Maintenance Summary - 5 Years
100
IL010 - Replacing the Pneumatically Pilot- Controlled Cooling Lubricant Valves
101
IL060 - Check the Pretension on the Spindle Bearings on the Main and Counter Spindles
102
Service Interval - 8 Years
103
Maintenance Summary - 8 Years
104
JL005 - Note on Replacing the Window Pane or Removing the Design Pane
105
JL010 - Replace the Window Pane
108
Advertisement
Traub TNL20 Operating Instructions Manual (74 pages)
Brand:
Traub
| Category:
Industrial Equipment
| Size: 13 MB
Table of Contents
Table of Contents
3
Safety
7
Explanation of Symbols
7
Safety Instructions and Technical Specifications
7
Information on Transport, Installation, Commissioning
8
General Hazards During On-Site Transport
9
Dimensions and Masses
9
Transporting and Lifting Aids
9
Installation Plan
11
Installation Plan TNL20, Simplified
11
Installation Plan TNL20 with Ixcenter, Simplified
12
General General
13
Preparations
13
Suitable Transporting and Lifting Aids
13
Information for Transporting the Machine
14
Machine Weight and Machine Dimensions
15
Space Requirements
16
Floor Condition
16
Fastening/Anchoring
16
Ambient Conditions
17
Floor Trough
17
Compressed-Air Supply
17
Operating Material to be Provided
17
Pumps and Tanks
17
Connection to Local Extraction System by Customer
17
Power Supply
18
Main Circuit Breaker
18
External Data Transfer
18
Chip Removal
19
Disposal of Used Operating Materials
19
Observing the Ground and Wastewater Regulations
19
Preparing the Machine for Transport Preparing the Machine for Transport
21
Locations of the Axes for Attaching the Transport Locks
21
Seal Disconnected Hose Lines or Pipelines
22
Corrosion Protection
22
Fit Transport Locks and Drip Pan
23
Transport Lock - Main Spindle
24
Transport Lock - Lower Tool Carrier, Front Working Attachment, and Counter Spindle
25
Transport Lock - Upper Tool Carrier
26
Transport Lock - Workpiece Removal Unit
27
Transport Locks - Operating Panel
28
Transport Locks - Work Area Door
29
Transport Lock - Ixcenter (Optional)
30
Attaching the Drip Pan
32
Transporting the Machine Transporting the Machine
33
Packaging of the Machine, the Machine Components and Accessories
33
Machine Center of Gravity (S)
34
Basic Machine TNL20
34
TNL20 with Ixcenter
35
Machine Ready for Shipping
36
Openings for Inserting the Fork Arms of the Fork Lift Truck
37
Forklift Requirement
37
Transporting the Machine by Truck
38
Loading Guard
39
Unloading and Transporting the Machine by Forklift
42
Transporting with Transport Rollers
45
Technical Requirements - Transport Rollers
46
Mounting Transport Support
47
Transporting Machine to Installation Site
50
Installation of the Machine Installation of the Machine
51
Electrical Connection
51
Aligning and Anchoring the Machine
51
Removing the Transport Locks and Drip Pan from the Machine
53
Indicator Lamp
53
Operating Material
53
TNL20 with Ixcenter (Optional)
54
Connecting the Machine to Central Extraction System
55
Shutoff Damper for Fire Protection
55
Installing Configuration Levels and Additional Equipment Installing Configuration Levels and Additional Equipment
57
Transport and Installation of the Chip Conveyor and Chip Pan
57
Installation of Chip Conveyor
57
For Custom Applications on the Left
58
Fitting of the Chip Pan (Optional)
60
Splash Guard Plate on the Chip Conveyor/Chip Pan
61
Installing the Cooling Lubricant System
62
Workpiece Removal through Counter Spindle
63
Electrical Connection Electrical Connection
65
Important Notes
65
Operating Material
67
Overview of Operating Materials
67
Pneumatic Connection Pneumatic Connection
69
Provision of Compressed Air
69
Air Consumption
69
Switching on the Machine Switching on the Machine
71
Advertisement
Related Products
Traub TNX65/42
Traub TX8i-s
Traub TNA400.2
Traub TNX200.3
Traub TNX220.3
Traub TNX200
Traub TNX220
Traub TNL12.2
Traub TNX65
Traub TNX42
Traub Categories
Industrial Equipment
Lathe
More Traub Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL