Sign In
Upload
Manuals
Brands
Traub Manuals
Lathe
TNL12.2
Traub TNL12.2 Manuals
Manuals and User Guides for Traub TNL12.2. We have
2
Traub TNL12.2 manuals available for free PDF download: Operating Instructions Manual
Traub TNL12.2 Operating Instructions Manual (98 pages)
Brand:
Traub
| Category:
Industrial Equipment
| Size: 6 MB
Table of Contents
Table of Contents
3
Preface
5
General Notes
5
Safety Instructions
6
Service Interval - Care Activities
9
Maintenance Summary - Care Activities
10
AL012 - Check the Work Area Door and Window Pane
11
AL013 - Clean the Guide Rail/Gutter at the Work Area Door
13
AL047 - Check Pneumatic Unit (Visual Inspection)
14
AL051 - Check the Filter Mat of the Main and Counter Spindle Cooling, Clean if Necessary
15
AL076 - Check Fill Levels of the Fluid Tanks
17
AL095 - Visual Inspection of All Fluid Lines and Electrical Cables
19
AL122 - Check Cooling Lubricant (Visual Inspection)
20
AL137 - Check the Fan in the Control Cabinet, Clean if Necessary
22
AL149 - Check Work Area Light (Visual Inspection)
23
AL164 - Clean and Check All Telescopic Covers and Telescopes of the Tool Carrier Units
24
AL168 - Pneumatic Clamping Device, Clamping Without Collet
25
AL169 - Clean and Lubricate Clamping Device
26
AL170 - Check Pneumatic Hollow Clamping Device (Spring Tension) on Main and Counter Spindles
28
AL171 - Clean Covers and Wipers
30
AL180 - Clean the Work Area
31
AL241 - Clean the Chip Pan
32
AL250 - Clean the Strainer Baskets (Twin Strainer Basket) of the Cooling Lubricant Unit
34
AL264 - Clean the Chip Conveyor
35
AL312 - Lubricate All Linear Axes by Moving the Axes
37
Service Interval - 2.000 Operating Hours
39
Maintenance Summary - 2.000 Operating Hours
40
CL010 - Check Maintenance Logs of Servicing Activities
41
CL020 - Clean and Check Wipers and Guide Rails of the Work Area Door
42
CL120 - Replace Post-Filter for Cutting Oil Mist
45
CL500 - Perform Data Backup
46
CL520 - Check Control Cabinet
47
Service Interval - 4.000 Operating Hours
49
Maintenance Summary - 4.000 Operating Hours
50
DL010 - Cleaning of the Machine
51
DL031 - Check Coolant
53
DL052 - Check Central Lubrication Unit
55
DL056 - Check Pneumatic Unit
57
DL072 - Check Pneumatic Hollow Clamping Device (Spring Tension) on Main and Counter Spindles
59
DL076 - Check the Cycloidal Gear on the Upper and Lower Turrets
61
DL160 - Determine Axis Ball Screw Backlash
62
DL170 - Axes
64
DL180 - Check Fire Protection System (Visual Inspection)
65
DL227 - Replace Belts and Check Belt Tension
66
DL485 - Replace the Wiper and Telescopic Plates
68
DL493 - Replace Wiper in Guide Sleeve for Fixed Headstock Operation
72
DL510 - Perform Data Backup
73
DL520 - Check Control Cabinet and Cable Assemblies (Visual Inspection)
74
DL590 - Check Inspection/Replacement Date of the Backup Batteries in the Control Cabinet (NC)
76
DL636 - Check the Replacement Interval of the Servo Backup Batteries at the Axis Servos
78
DL640 - Check the Check Valve of the Workpiece Pickup/Gripper Unit
80
Service Interval - 8.000 Operating Hours
81
Maintenance Summary - 8.000 Operating Hours
82
EL021 - Check Pneumatic Hollow Clamping Device (Spring Tension) on Main and Counter Spindles, Replace if Necessary
83
Service Interval - 5 Years
85
Maintenance Summary - 5 Years
86
IL010 - Replacing the Pneumatically Pilot- Controlled Cooling Lubricant Valves
87
Service Interval - 8 Years
89
Maintenance Summary - 8 Years
90
JL012 - Replace the Window Pane of the Work Area Door
91
Advertisement
Traub TNL12.2 Operating Instructions Manual (62 pages)
Brand:
Traub
| Category:
Lathe
| Size: 8 MB
Table of Contents
Table of Contents
3
Safety
7
Explanation of Symbols
7
Safety Instructions Documentation
7
Installation Plan
9
Installation Plan TNL12.2, Simplified
9
Installation Items - Load Distribution TNL12.2
10
General
11
Information for Transporting the Machine
11
Lifting Device
11
Information on Where the Machine Is Installed
12
Space Requirements
12
Environmental Conditions
12
Subsoil, Foundation
12
Floor Trough
13
Compressed-Air Supply
13
Operating Material to be Provided
13
Pumps and Tanks
13
Customer Site Attachment of a Local Extraction System
13
Power Supply
14
Main Circuit Breaker
14
External Data Transfer
14
Chip Disposal
15
Disposal of Used Operating Materials
15
Observing the Ground and Wastewater Regulations
15
Transporting the Machine
17
Delivery of the Machine
17
Dimensions and Weights
18
Machine TNL12.2
18
Cooling Lubricant Unit
18
Machine Center of Gravity (S)
19
Transport by Crane (Min. 3 T Capacity)
20
Attaching the Lifting Device Components
21
Attaching the Machine to the Lifting Device
22
Transporting the Machine
23
Transporting with a Forklift
24
Technical Requirements - Forklift
24
Transporting with Transport Casters
27
Technical Requirements - Transport Casters
28
Installing the Machine
33
Electrical Connection
33
Aligning and Doweling the Machine
33
Spirit Level and Support Surface
33
Installation Items
33
Aligning
34
Fastening to the Floor
34
Removing the Transport Locks from the Machine
36
Locations of the Transport Locks on the Machine
36
Transport Lock at Main Spindle
37
Transport Lock at Counter Spindle and Back Working Attachment
38
Upper Tool Carrier and Front Working Attachment
39
Transport Lock at Operating Panel
39
Transport Lock at Work Area Door
40
Connecting the Machine to Central Suction Unit
41
Shutoff Valve for Fire Protection
41
Indicator Lamp
43
Installing Configuration Levels and Additional Equipment
45
Transporting and Installing the Cooling Lubricant Unit
45
Installing the Cooling Lubricant Unit
46
Sealing of Cooling Lubricant Unit / Machine
47
Connecting the Cooling Lubricant Unit
48
Electrical Connection
49
Important Notes
49
Pneumatic Connection
51
Provision of Compressed Air
51
Air Consumption
51
Commissioning
53
Cleaning the Machine
53
Check the Operating Fluid Levels and Replenishing, if Necessary
54
Data Loss Due to Prolonged Downtime
54
Switching on the Machine
55
Relocation of the Machine Relocation of the Machine
57
Preparing the Machine for Transport
57
Transport Locks on the Machine
57
Locations of the Axes for Attaching the Transport Locks
57
Drain the Hydraulic Tank before Transport
58
Seal Disconnected Hose Lines or Pipelines
58
Corrosion Protection
58
Transporting the Machine with a Truck
59
Loading Guard
60
Advertisement
Related Products
Traub TNX65
Traub TNX42
Traub TNL20
Traub TNX65/42
Traub TX8i-s
Traub TNA400.2
Traub TNX200.3
Traub TNX220.3
Traub TNX200
Traub TNX220
Traub Categories
Industrial Equipment
Lathe
More Traub Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL