Sign In
Upload
Manuals
Brands
Oshkosh Corporation Manuals
Boom Lifts
JLG M400AJPnarrow
Oshkosh Corporation JLG M400AJPnarrow Manuals
Manuals and User Guides for Oshkosh Corporation JLG M400AJPnarrow. We have
3
Oshkosh Corporation JLG M400AJPnarrow manuals available for free PDF download: Service And Maintenance Manual
Oshkosh Corporation JLG M400AJPnarrow Service And Maintenance Manual (492 pages)
Brand:
Oshkosh Corporation
| Category:
Boom Lifts
| Size: 58 MB
Table of Contents
General
3
Bhydraulic System Safety
3
Maintenance
3
Table of Contents
5
Specifications
20
Operating Specifications
20
Capacities
20
Tires
20
Dimensional Data
21
Lubrication Specifications
21
Hydraulic Oil
21
Critical Stability Weights
22
Torque Specifications
22
Major Component Weights
23
Serial Number Locations
23
Maintenance and Lubrication
25
General
34
Machine Preparation, Inspection, and Maintenance
34
Preparation, Inspection, and Maintenance
34
Pre-Start Inspection
34
Pre-Delivery Inspection and Frequent Inspection
34
Annual Machine Inspection
34
Preventative Maintenance
34
Service and Guidelines
35
General
35
Safety and Workmanship
35
Cleanliness
35
Components Removal and Installation
35
Component Disassembly and Reassembly
36
Pressure-Fit Parts
36
Bearings
36
Gaskets
36
Bolt Usage and Torque Application
36
Hydraulic Lines and Electrical Wiring
36
Hydraulic System
36
Lubrication
37
Battery
37
Lubrication and Servicing
37
Lubrication and Information
37
Hydraulic System
37
Hydraulic Oil
37
Changing Hydraulic Oil
37
Lubrication Specifications
37
Cylinder Drift
38
Theory
38
Cylinder Leakage Test
38
Cylinder Thermal Drift
38
Pins and Composite Bearing Repair Guidelines
39
Welding on JLG Equipment
39
Do the Following When Welding on JLG Equipment
39
Do NOT Do the Following When Welding on JLG Equipment
39
Chassis & Turntable
45
Tires & Wheels
45
Tire Inflation
45
Tire Damage
45
Tire Replacement
45
Wheel Replacement
45
Wheel Installation
45
Spindle
46
Setting Wheel Bearing End Play
46
Specifications
46
Checking
46
Greasing Requirements
46
Tilt Module
49
Speed Sensor
51
Drive Hub
57
Roll and Leak Testing
57
Tightening and Torquing Bolts
57
Main Disassembly
58
Output Carrier Disassembly
60
Input Carrier Disassembly
62
Hub-Spindle Disassembly
63
Cover Disassembly
64
Input Carrier Assembly
65
Output Planet Gear Assembly
65
Output Carrier Assembly
66
Hub-Spindle Assembly
66
Cover Assembly
67
Main Assembly
67
Drive Motor
70
Removal
70
Disassembly
70
Inspection
70
Assembly
71
Installation
71
Swing Bearing
73
Turntable Bearing Mounting Bolt Condition Check
73
Wear Tolerance
74
Replacement of Swing Bearing
75
Swing Bearing Torque Value
79
Checking Worm Gear End Play
79
Adjusting End Play
79
Swing Motor
81
Preparation before Disassembly
84
Disassembly and Inspection
84
Assembly
91
One Piece Stator Construction
97
Two Piece Stator Construction
98
Final Checks
98
Battery Maintenance and Charging
99
Battery Maintenance, Quarterly
99
Optional on Board Generator
99
Battery Charging (on Board Charger)
99
Battery Charger
101
Operating Instructions
101
Maintenance Instructions
102
Battery Charger Fault Codes
102
Excessive Battery Watering Requirements or Strong Sulphur (Rotten Egg) Smell
106
Checking/Changing the Battery Charger Algorithm
106
Generator
107
Engine
107
Alternator
107
Dynamo and Dynamo Voltage Regulator
107
Dynamo Output Fuse
107
Control Fuse
107
Start Battery
109
Engine Starter
109
Start Control Relay
109
Fuel Control Relay
110
Glow Plug Control Relay
110
Glow Plug
110
Fuel Pump
111
Fuel Solenoid
111
Engine Low Oil Pressure Switch
111
Engine Oil Temperature Sensor
111
Alternator Output Current Sensor
112
Engine Speed Sensor
112
RBS Engine/Generator Controller
112
Warnings and Safety Precautions
113
System Controls
113
System Status and Performance Monitoring
113
System Settings
113
RBS Start
114
RBS Shutdown
114
RBS Alarms and Flash Codes
115
Resetting the RBS Controller
115
Maintenance Schedule
115
Troubleshooting
116
APU Engine Start Battery Boosting
117
Supplementary Fuse for APU
118
Tools and Material
118
Procedure
118
Boom & Platform
121
Platform
121
Support Removal
121
Support Installation
122
Rotator and Slave Cylinder Removal
124
Removal
124
Installation
124
Main Boom Powertrack
125
Removal
125
Installation
125
Boom Maintenance
126
Removal
126
Disassembly
127
Inspection
127
Assembly
127
Installation
128
Wear Pads
129
Boom Limit Switches
129
Boom Cleanliness Guidelines
129
Articulating Jib Boom
132
Removal
132
Disassembly
132
Inspection
132
Assembly
132
Boom Synchronizing Procedure
133
Footswitch Adjustment
133
Rotary Actuator
134
Theory of Operation
134
Tools Required for Assembly/Disassembly
134
Disassembly
137
Inspection
140
Assembly
141
Installing Counterbalance Valve
145
Greasing Thrust Washers
146
Testing the Actuator
146
Installation and Bleeding
147
Troubleshooting
148
Powertrack Maintenance
149
Removing a Link
149
Installing a New Link
152
Replacing Fixed End Brackets
157
Replacing Moving End Brackets
159
Skyguard
161
Operation
161
Function Test
161
Diagnostics & Troubleshooting
162
Basic Hydraulic Information & Schematics
164
Lubricating O-Rings in the Hydraulic System
164
Cup and Brush
164
Dip Method
165
Spray Method
165
Brush-On Method
165
Hydraulic Connection Assembly and Torque Specification
166
Tapered Thread Types
166
Straight Thread Types, Tube and Hose Connections
166
Straight Thread Types, Port Connections
167
Flange Connection Types
167
Tightening Methods
167
Assembly and Torque Specifications
168
Assembly Instructions for American Standard Pipe Thread Tapered (NPTF) Connections
169
Assembly Instructions for British Standard Pipe Thread Tapered (BSPT) Connections
170
Assembly Instructions for 37° (JIC) Flare Fittings
171
Assembly Instructions for 45° SAE Flare Fittings
175
Assembly Instructions for O-Ring Face Seal (ORFS) Fittings
177
Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)
179
Assembly Instructions for Bulkhead (BH) Fittings
181
Assembly Instructions for Adjustable Port End Metric (MFF) Fittings
193
Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Ends
201
Assembly Instructions for Adjustable Port End (BSPP) Fittings
203
Assembly Instructions for Flange Connections: (FL61 and FL62)
211
Double Wrench Method
214
FFWR and TFFT Methods
215
Adjustable Stud End Assembly
215
O-Ring Installation (Replacement)
216
Hydraulic Cylinders
217
Slave Cylinder (E400AN Only)
217
Slave Cylinder (E400AJP/M400AJP/E400AJPN/M400AJPN Only)
222
Jib Lift Cylinder
227
Lower Lift Cylinder (E400AN Only)
232
Lower Lift Cylinder (E400AJP/M400AJP/E400AJPN/M400AJPN Only)
239
MID Lift Cylinder(E400AN Only)
246
MID Lift Cylinder (E400AJP/M400AJP/E400AJPN/M400AJPN Only)
253
Upper Lift Cylinder
260
Master Cylinder (E400AN Only)
268
Master Cylinder (E400AJP/M400AJP/E400AJPN/M400AJPN Only)
273
Steer Cylinder
278
Telescope Cylinder (E400AN Only)
283
Telescope Cylinder (E400AJP/M400AJP/E400AJPN/M400AJPN Only)
288
Cylinder Removal and Installation
296
Main Boom Lift Cylinder Removal
296
Main Boom Lift Cylinder Installation
296
MID Boom Lift Cylinder Removal
297
MID Boom Lift Cylinder Installation
297
Lower Boom Lift Cylinder Removal
298
Lower Boom Lift Cylinder Installation
298
Main Boom Telescope Cylinder Removal
299
Main Boom Telescope Cylinder Installation
299
Pressure Setting Procedures
300
Main Relief
300
Main Lift down Relief
300
Lower Lift down Relief
300
Telescope Relief
300
Platform Level up Relief
301
Platform Level down Relief
301
Steer Relief
302
Jib Lift (up and Down) Relief
302
Releveling Valve Relief
302
Jlg Control System
329
Introduction
329
To Connect the JLG Control System Analyzer
330
Using the Analyzer
330
Changing the Access Level of the Hand Held Analyzer
331
Adjusting Parameters Using the Hand Held Analyzer
332
Machine Setup
332
Level Vehicle Description
333
Machine Personality Settings
341
Test Notes
351
Function Speed
351
Help Descriptions and Fault Flash Codes
362
Analyzer Diagnostics Menu Structure
369
System Self Test
375
Calibrating Steer
380
Calibrating Tilt Sensor
382
Calibrating Load Sensing
383
LSS System
386
Diagnostic Menu
387
Calibration Procedure
388
Testing & Evaluation
393
Troubleshooting
394
Resetting the MSSO System
395
Basic Electrical Information & Schematics
415
General
415
Multimeter Basics
415
Grounding
415
Backprobing
415
Min/Max
415
Polarity
415
Scale
415
Voltage Measurement
415
Resistance Measurement
416
Continuity Measurement
416
Current Measurement
417
Checking Switches
417
Basic Check
417
Limit Switches
417
Automatic Switches
418
Switch Wiring - Low Side, High Side
418
Installation of Dielectric Grease
419
Deutsch HD, DT, DTM, DRC Series
419
AWP Seal
419
AMP Mate-N-Lok
420
DIN Connectors
420
Exclusions
420
AMP Connector
422
Applying Silicone Dielectric Compound to AMP Connectors
422
Assembly
422
Disassembly
424
Wedge Lock
424
Service - Voltage Reading
424
DEUTSCH Connectors
426
DT/DTP Series Assembly
426
DT/DTP Series Disassembly
426
HD30/HDP20 Series Assembly
427
HD30/HDP20 Series Disassembly
427
Wiring Harness Connector Labels
428
Connector Labels
428
Component Labels
428
Advertisement
Oshkosh Corporation JLG M400AJPnarrow Service And Maintenance Manual (261 pages)
Brand:
Oshkosh Corporation
| Category:
Boom Lifts
| Size: 20 MB
Table of Contents
Bhydraulic System Safety
3
Maintenance
3
Table of Contents
5
Section 1 - Specifications
16
Operating Specifications
16
Capacities
16
Battery Charger
16
Drive System
16
Hydraulic Pump/Electric Motor Assembly
16
Generator
16
Tires
16
Dimensional Data
17
Function Speeds
17
Machine Orientation When Doing Function Tests
18
Torque Specifications
18
Cylinder Specifications
19
Major Component Weights
19
Critical Stability Weights
20
Pressure Settings
20
Serial Number Locations
21
Lubrication
21
Lubrication Specifications
21
Operator Maintenance & Lubrication
23
Section 2 - General
34
Machine Preparation, Inspection, and Maintenance
34
General
34
Preparation, Inspection, and Maintenance
34
Pre-Start Inspection
34
Pre-Delivery Inspection and Frequent Inspection
34
Annual Machine Inspection
34
Preventive Maintenance
34
Service and Guidelines
35
General
35
Safety and Workmanship
35
Cleanliness
35
Components Removal and Installation
35
Component Disassembly and Reassembly
36
Pressure-Fit Parts
36
Bearings
36
Gaskets
36
Bolt Usage and Torque Application
36
Hydraulic Lines and Electrical Wiring
36
Hydraulic System
36
Lubrication
36
Battery
36
Lubrication and Servicing
36
Hydraulic Oil
37
Changing Hydraulic Oil
37
Lubrication Specifications
37
Cylinder Drift Test
37
Platform Drift
37
Cylinder Drift
37
Pins and Composite Bearing Repair Guidelines
38
Welding on JLG Equipment
38
Do the Following When Welding on JLG Equipment
38
Do NOT Do the Following When Welding on JLG Equipment
38
Engine Operating Temperature Specifications - Kubota
42
Section 3 - Chassis & Turntable
44
Tires & Wheels
44
Tire Inflation
44
Tire Damage
44
Tire Replacement
44
Wheel Replacement
44
Wheel Installation
44
Spindle
45
Setting Wheel Bearing End Play
45
Specifications
45
Checking
45
Greasing Requirements
45
Drive Hub (Part No. 2780236)
47
Dissembling
47
Disassembly
48
Disassembly of the First Stage Planetary Assembly (7)
48
Disassembly of Second Stage Planet Gears (1)
48
Assembly of First Stage Planetary Assembly (7)
48
Assembly of End Cover Unit (8)
48
Final Assembly
49
Initial Start-Up and after Repairs
49
Maintenance
49
Oil Change Interval-Gear Drive
49
Setting of Tapered Roller Bearings
49
Securing of the Shaft Nut
49
Drive Hub- Cutaway
49
Drive Brake - Mico
51
Disassembly
51
Assembly
51
Bleeding
51
Drive Brake
51
Speed Sensor Adjustment
54
Adjustment Procedure
54
Speed Sensor Orientation
55
Speed Sensor Installation Verification
59
Verification W/ Analyzer Procedure
59
Positrac/Tilt Module
62
Swing Motor - S/N 0300135649 to Present
64
Swing Motor - Cutaway
64
Swing Motor - Exploded View
66
Preparation before Disassembly
67
Disassembly and Inspection
67
Assembly
73
One Piece Stator Construction
80
Two Piece Stator Construction
81
Final Checks
81
Swing Bearing
82
Turntable Bearing Mounting Bolt Condition Check
82
Swing Bearing Feeler Gauge Check
82
Wear Tolerance
83
Swing Bearing Tolerance Boom Placement
83
Replacement of Swing Bearing
84
Swing Bearing Tolerance Measuring Point
84
Swing Bearing Torquing Sequence
85
Swing Bearing Torque Value
86
Checking Worm Gear End Play
86
Adjusting End Play
86
Battery Maintenance and Charging
88
Battery Maintenance, Quarterly
88
Charging Sequence of Remote LED Card
88
Remote LED Card
88
Battery Cable Connections
89
Battery Charging (on Board Charger)
90
Optional on Board Generator
90
Batteries and Battery Charger (Prior to S/N 0300059350)
90
On Board Generator
90
Battery Charger (S/N 0300059350 to Present)
92
Battery Charger ((S/N 0300059350 to Present)
92
Operating Instructions
92
Maintenance Instructions
92
Battery Charger Fault Codes
92
Excessive Battery Watering Requirements or Strong Sulphur (Rotten Egg) Smell
95
Checking/Changing the Battery Charger Algorithm
96
Generator (Prior to S/N 88539)
97
Alternator
97
Dynamo and Dynamo Voltage Regulator
97
Dynamo Output Fuse
97
Control Fuse
97
Start Battery
97
Engine Starter
97
Start Control Relay
97
Fuel Control Relay
97
Fuel Solenoid
97
To Connect the JLG Control System Analyzer to the Generator
100
Alarms and Fault Flash Codes
100
Output Current and Voltage Settings
102
Priming the Fuel Line
103
Generator (S/N 88539 to Present)
104
Engine
104
Alternator
104
Dynamo and Dynamo Voltage Regulator
104
Dynamo Output Fuse
104
Control Fuse
104
Start Battery
106
Engine Starter
106
Start Control Relay
106
Fuel Control Relay
107
Glow Plug Control Relay
107
Glow Plug
107
Fuel Pump
108
Fuel Solenoid
108
Engine Low Oil Pressure Switch
108
Engine Oil Temperature Sensor
108
Alternator Output Current Sensor
109
Engine Speed Sensor
109
RBS Engine/Generator Controller
109
Warnings and Safety Precautions
110
System Controls
110
System Status and Performance Monitoring
110
System Settings
110
RBS Start
111
RBS Shutdown
111
RBS Alarms and Flash Codes
112
Resetting the RBS Controller
112
Maintenance Schedule
112
Troubleshooting
113
APU Engine Start Battery Boosting
114
Supplementary Fuse for Apu
115
Tools and Material
115
Procedure
115
Section 4 - Boom & Platform
118
Boom Maintenance
118
Removal
118
Disassembly
118
Inspection
119
Assembly
119
Installation
120
Upper (Main) Boom Lift Cylinder
121
Removal
121
Installation
121
MID Boom Lift Cylinder
121
MID Boom Lift Cylinder Removal
121
Installation
122
Lower Boom Lift Cylinder
122
Removal
122
Lower Boom Lift Cylinder Removal
122
Upper Boom Telescope Cylinder
123
Removal
123
Installation
123
MID and Lower Lift Cylinder Bleeding Procedure
124
Wear Pads
124
Boom Synchronizing Procedure
125
Articulating Jib Boom
125
Removal
125
Disassembly
125
Inspection
125
Assembly
127
Footswitch Adjustment
127
Boom Limit Switches
127
Helac Rotary Actuator
129
Theory of Operation
129
Tools Required for Assembly/Disassembly
132
Disassembly
132
Inspection
136
Assembly
136
Installing Counterbalance Valve
140
Testing the Actuator
140
Installation and Bleeding
142
Troubleshooting
143
Powertrack Maintenance
144
Removing a Link
144
Installing a New Link
147
Replacing Fixed End Brackets
152
Replacing Moving End Brackets
154
Section 5 - Hydraulics
157
Lubricating O-Rings in the Hydraulic System
157
Cup and Brush
157
Dip Method
158
Spray Method
158
Brush-On Method
158
Cylinders - Theory of Operation
159
Double Acting Cylinder
159
Cylinder Checking Procedures
159
Cylinder Without Counterbalance Valves
159
Cylinders with Single Counterbalance Valve
159
Cylinders with Dual Counterbalance Valve
170
Cylinder Repair
170
Disassembly
170
Cleaning and Inspection
171
Assembly
172
Pressure Setting Procedures
176
Main Relief
176
Upper Lift down Relief
176
Lower Lift down Relief
176
Telescope Relief
176
Platform Level up Relief
176
Platform Level down Relief
177
Steer Relief
177
Jib Lift (up and Down) Relief
177
Jib Swing Relief
177
Releveling Valve Relief
177
Section 6 - Jlg Control System
184
JLG Control System Analyzer Kit Instructions
184
Introduction
184
To Connect the JLG Control System Analyzer
185
Using the Analyzer
186
Changing the Access Level of the Hand Held Analyzer
187
Adjusting Parameters Using the Hand Held Analyzer
188
Machine Setup
188
Machine Personality Settings
189
Machine Configuration Programming Information
193
Level Vehicle Description
194
Help Descriptions and Fault Flash Codes
194
Analyzer Diagnostics Menu Structure
204
System Self Test
205
Section 7 - Basic Troubleshooting, Electrical Information, & Schematics
218
General
218
Troubleshooting
218
Multimeter Basics
236
Grounding
236
Backprobing
236
Min/Max
236
Polarity
236
Scale
236
Voltage Measurement
236
Resistance Measurement
237
Continuity Measurement
237
Current Measurement
238
Checking Switches
238
Basic Check
238
Limit Switches
238
Automatic Switches
239
Switch Wiring - Low Side, High Side
239
Applying Silicone Dielectric Compound to Electrical Connections
239
AMP Connector
240
Applying Silicone Dielectric Compound to AMP Connectors
240
Assembly
240
Disassembly
242
Wedge Lock
242
Service - Voltage Reading
242
Deutsch Connectors
244
DT/DTP Series Assembly
244
DT/DTP Series Disassembly
244
HD30/HDP20 Series Assembly
245
HD30/HDP20 Series Disassembly
245
Oshkosh Corporation JLG M400AJPnarrow Service And Maintenance Manual (258 pages)
Brand:
Oshkosh Corporation
| Category:
Boom Lifts
| Size: 16 MB
Table of Contents
Bhydraulic System Safety
3
Maintenance
3
Table of Contents
5
Section 1 - Specifications
15
Operating Specifications
15
Capacities
15
Battery Charger
15
Drive System
15
Hydraulic Pump/Electric Motor Assembly
15
Generator
15
Tires
15
Dimensional Data
16
Function Speeds
16
Machine Orientation When Doing Function Tests
17
Torque Specifications
17
Cylinder Specifications
18
Major Component Weights
18
Critical Stability Weights
19
Pressure Settings
19
Serial Number Locations
20
Lubrication
20
Lubrication Specifications
20
Operator Maintenance & Lubrication
22
Section 2 - General
33
Machine Preparation, Inspection, and Maintenance
33
General
33
Preparation, Inspection, and Maintenance
33
Pre-Start Inspection
33
Pre-Delivery Inspection and Frequent Inspection
33
Annual Machine Inspection
33
Preventive Maintenance
33
Service and Guidelines
34
General
34
Safety and Workmanship
34
Cleanliness
34
Components Removal and Installation
34
Component Disassembly and Reassembly
35
Pressure-Fit Parts
35
Bearings
35
Gaskets
35
Bolt Usage and Torque Application
35
Hydraulic Lines and Electrical Wiring
35
Hydraulic System
35
Lubrication
35
Battery
35
Lubrication and Servicing
35
Hydraulic Oil
36
Changing Hydraulic Oil
36
Lubrication Specifications
36
Cylinder Drift Test
36
Platform Drift
36
Cylinder Drift
36
Pins and Composite Bearing Repair Guidelines
37
Welding on JLG Equipment
37
Do the Following When Welding on JLG Equipment
37
Do NOT Do the Following When Welding on JLG Equipment
37
Engine Operating Temperature Specifications - Kubota
41
Section 3 - Chassis & Turntable
43
Tires & Wheels
43
Tire Inflation
43
Tire Damage
43
Tire Replacement
43
Wheel Replacement
43
Wheel Installation
43
Spindle
44
Setting Wheel Bearing End Play
44
Specifications
44
Checking
44
Greasing Requirements
44
Drive Hub (Part No. 2780236)
46
Dissembling
46
Disassembly
47
Disassembly of the First Stage Planetary Assembly (7)
47
Disassembly of Second Stage Planet Gears (1)
47
Assembly of First Stage Planetary Assembly (7)
47
Assembly of End Cover Unit (8)
47
Final Assembly
48
Initial Start-Up and after Repairs
48
Maintenance
48
Oil Change Interval-Gear Drive
48
Setting of Tapered Roller Bearings
48
Securing of the Shaft Nut
48
Drive Hub- Cutaway
48
Drive Brake - Mico
50
Disassembly
50
Assembly
50
Bleeding
50
Drive Brake
50
Speed Sensor Adjustment
53
Adjustment Procedure
53
Speed Sensor Orientation
54
Speed Sensor Installation Verification
58
Verification W/ Analyzer Procedure
58
Positrac/Tilt Module
61
Swing Motor - S/N 0300135649 to Present
63
Swing Motor - Cutaway
63
Swing Motor - Exploded View
65
Preparation before Disassembly
66
Disassembly and Inspection
66
Assembly
72
One Piece Stator Construction
79
Two Piece Stator Construction
80
Final Checks
80
Swing Bearing
81
Turntable Bearing Mounting Bolt Condition Check
81
Swing Bearing Feeler Gauge Check
81
Wear Tolerance
82
Swing Bearing Tolerance Boom Placement
82
Replacement of Swing Bearing
83
Swing Bearing Tolerance Measuring Point
83
Swing Bearing Torquing Sequence
84
Swing Bearing Torque Value
85
Checking Worm Gear End Play
85
Adjusting End Play
85
Battery Maintenance and Charging
87
Battery Maintenance, Quarterly
87
Charging Sequence of Remote LED Card
87
Remote LED Card
87
Battery Cable Connections
88
Battery Charging (on Board Charger)
89
Optional on Board Generator
89
Batteries and Battery Charger (Prior to S/N 0300059350)
89
On Board Generator
89
Battery Charger (S/N 0300059350 to Present)
91
Battery Charger ((S/N 0300059350 to Present)
91
Operating Instructions
91
Maintenance Instructions
91
Battery Charger Fault Codes
91
Excessive Battery Watering Requirements or Strong Sulphur (Rotten Egg) Smell
94
Checking/Changing the Battery Charger Algorithm
95
Generator (Prior to S/N 88539)
96
Alternator
96
Dynamo and Dynamo Voltage Regulator
96
Dynamo Output Fuse
96
Control Fuse
96
Start Battery
96
Engine Starter
96
Start Control Relay
96
Fuel Control Relay
96
Fuel Solenoid
96
To Connect the JLG Control System Analyzer to the Generator
99
Alarms and Fault Flash Codes
99
Output Current and Voltage Settings
101
Priming the Fuel Line
102
Generator (S/N 88539 to Present)
103
Engine
103
Alternator
103
Dynamo and Dynamo Voltage Regulator
103
Dynamo Output Fuse
103
Control Fuse
103
Start Battery
105
Engine Starter
105
Start Control Relay
105
Fuel Control Relay
106
Glow Plug Control Relay
106
Glow Plug
106
Fuel Pump
107
Fuel Solenoid
107
Engine Low Oil Pressure Switch
107
Engine Oil Temperature Sensor
107
Alternator Output Current Sensor
108
Engine Speed Sensor
108
RBS Engine/Generator Controller
108
Warnings and Safety Precautions
109
System Controls
109
System Status and Performance Monitoring
109
System Settings
109
RBS Start
110
RBS Shutdown
110
RBS Alarms and Flash Codes
111
Resetting the RBS Controller
111
Maintenance Schedule
111
Troubleshooting
112
APU Engine Start Battery Boosting
113
Supplementary Fuse for Apu
114
Tools and Material
114
Procedure
114
Section 4 - Boom & Platform
117
Boom Maintenance
117
Removal
117
Disassembly
117
Inspection
118
Assembly
118
Installation
119
Upper (Main) Boom Lift Cylinder
120
Removal
120
Installation
120
MID Boom Lift Cylinder
120
MID Boom Lift Cylinder Removal
120
Installation
121
Lower Boom Lift Cylinder
121
Removal
121
Lower Boom Lift Cylinder Removal
121
Upper Boom Telescope Cylinder
122
Removal
122
Installation
122
Upper Telescope Cylinder Removal
122
MID and Lower Lift Cylinder Bleeding Procedure
123
Wear Pads
123
Boom Synchronizing Procedure
124
Articulating Jib Boom
124
Removal
124
Disassembly
124
Inspection
124
Assembly
126
Footswitch Adjustment
126
Boom Limit Switches
126
Helac Rotary Actuator
128
Theory of Operation
128
Tools Required for Assembly/Disassembly
131
Disassembly
131
Inspection
135
Assembly
135
Installing Counterbalance Valve
139
Testing the Actuator
139
Installation and Bleeding
141
Troubleshooting
142
Powertrack Maintenance
143
Removing a Link
143
Installing a New Link
146
Replacing Fixed End Brackets
151
Replacing Moving End Brackets
153
Section 5 - Hydraulics
155
Lubricating O-Rings in the Hydraulic System
155
Cup and Brush
155
Dip Method
156
Spray Method
156
Brush-On Method
156
Cylinders - Theory of Operation
157
Double Acting Cylinder
157
Cylinder Checking Procedures
157
Cylinder Without Counterbalance Valves
157
Cylinders with Single Counterbalance Valve
157
Cylinders with Dual Counterbalance Valve
168
Cylinder Repair
168
Disassembly
168
Cleaning and Inspection
169
Assembly
170
Pressure Setting Procedures
174
Main Relief
174
Upper Lift down Relief
174
Lower Lift down Relief
174
Telescope Relief
174
Platform Level up Relief
174
Platform Level down Relief
175
Steer Relief
175
Jib Lift (up and Down) Relief
175
Jib Swing Relief
175
Releveling Valve Relief
175
Section 6 - Jlg Control System
181
JLG Control System Analyzer Kit Instructions
181
Introduction
181
To Connect the JLG Control System Analyzer
182
Using the Analyzer
183
Changing the Access Level of the Hand Held Analyzer
184
Adjusting Parameters Using the Hand Held Analyzer
185
Machine Setup
185
Machine Personality Settings
186
Machine Configuration Programming Information
190
Level Vehicle Description
191
Help Descriptions and Fault Flash Codes
191
Analyzer Diagnostics Menu Structure
201
System Self Test
202
Section 7 - Basic Troubleshooting, Electrical Information, & Schematics
215
General
215
Troubleshooting
215
Multimeter Basics
233
Grounding
233
Backprobing
233
Min/Max
233
Polarity
233
Scale
233
Voltage Measurement
233
Resistance Measurement
234
Continuity Measurement
234
Current Measurement
235
Checking Switches
235
Basic Check
235
Limit Switches
235
Automatic Switches
236
Switch Wiring - Low Side, High Side
236
Applying Silicone Dielectric Compound to Electrical Connections
236
AMP Connector
237
Applying Silicone Dielectric Compound to AMP Connectors
237
Assembly
237
Disassembly
239
Wedge Lock
239
Service - Voltage Reading
239
Deutsch Connectors
241
DT/DTP Series Assembly
241
DT/DTP Series Disassembly
241
HD30/HDP20 Series Assembly
242
HD30/HDP20 Series Disassembly
242
Advertisement
Advertisement
Related Products
Oshkosh Corporation JLG M400AJP
Oshkosh Corporation JLG M400Ananow
Oshkosh Corporation JLG M400Anarrow
Oshkosh Corporation JLG E300A
Oshkosh Corporation JLG E300AJ
Oshkosh Corporation JLG E300AJP
Oshkosh Corporation JLG 660SJC
Oshkosh Corporation JLG 600SC
Oshkosh Corporation JLG 0300174703
Oshkosh Corporation JLG 0300236298
Oshkosh Corporation Categories
Boom Lifts
Lifting Systems
Scissor Lifts
Industrial Equipment
Air Compressor
More Oshkosh Corporation Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL