Sign In
Upload
Manuals
Brands
GESTRA Manuals
Controller
URB 55
User Manuals: GESTRA URB 55 Level Controller
Manuals and User Guides for GESTRA URB 55 Level Controller. We have
4
GESTRA URB 55 Level Controller manuals available for free PDF download: Original Installation & Operating Manual, Installation & Operating Manual
GESTRA URB 55 Installation & Operating Manual (72 pages)
Conductivity Controller LRR Visual Display and Operating Unit URB
Brand:
GESTRA
| Category:
Controller
| Size: 3 MB
Table of Contents
Table of Contents
2
Content of this Manual
5
Scope of Delivery/Product Package
5
How to Use this Manual
6
Illustrations and Symbols Used
6
Hazard Symbols in this Manual
6
Types of Warning
7
Specialist Terms/Abbreviations
8
Usage for the Intended Purpose
10
IT Security and Rules for the Use of Ethernet Devices
11
Applicable Directives and Standards - LRR 1-52, LRR 1-53
11
Applicable Directives and Standards - URB 55
12
Improper Use
12
Basic Safety Notes
13
Required Personnel Qualifications
13
Notes on Product Liability
13
Function
14
Possible Combinations of Functions and Equipment
14
Technical Data - LRR 1-52, LRR 1-53
16
Technical Data - URB 55
18
Factory Settings - LRR 1-52, LRR 1-53
20
Lrr 1-52
20
Lrr 1-53
20
Lrr 1-52, Lrr 1-53
20
Factory Settings - URB 55
21
Name Plate / Marking - LRR 1-52, LRR 1-53
22
Name Plate / Marking - URB 55
23
Functional Elements and Dimensions - LRR 1-52, LRR 1-53
24
Installing the LRR 1-52, LRR 1-53 Conductivity Controller
25
Dimensions - URB 55
26
Required Installation Aperture in the Control Cabinet Door or Switch Panel
26
Installing the URB 55
27
Connecting the URB 55
28
Ports and Sockets on the Back of the Unit
28
Connection for 24 V DC Supply Voltage - Pin Assignment
28
Pin Assignment of the Data Line between the URB 55 and the LRR 1-52, LRR 1-53
28
Safety Notes for Electrical Connection
29
Wiring Diagram - LRR 1-52 Conductivity Controller
30
Connecting LRG 1X-XX Conductivity Electrodes
30
Connecting LRG 16-9 Conductivity Electrode
31
Wiring Diagram - LRR 1-53 Conductivity Controller
32
Connecting an LRGT 1X-X Conductivity Transmitter (4 - 20 Ma) with Earthing Point
32
Electrical Connection - LRR 1-52, LRR 1-53
33
Connecting the 24 V DC Power Supply
33
Connecting the MIN/MAX/CLOSED/OPEN Output Contacts
33
Notes on Connecting Inductive Loads
33
Connecting an LRG 16-9 Conductivity Electrode
33
Connecting an LRGT 1X-X Conductivity Transmitter
34
Connecting the Actual Value/Manipulated Variable Output (4 - 20 Ma)
34
Connecting the Standby Input (24 V DC)
34
Connecting the Potentiometer (0 - 1000 W)
34
Connecting the Data Line between the Conductivity Controller and the URB 55
35
Connecting the Spectormodul Bus System
35
Changing the Equipment Settings
36
Status Display on the LRR 1-52, LRR 1-53
38
Visual Display and Operating Unit URB 55
39
Switching on the Supply Voltage
39
Operation and Navigation
40
User Interface (Example)
40
Colour Coding of Input and Status Fields
40
Automatic Functions
41
Entering Parameters Using the Virtual Keypad
41
Parameter Input with Password Protection
42
Scroll Bar for Long Lists and Menus
42
Icons and Functions - LRR 1-52, LRR 1-53
43
The Home Screen of the LRR 1-52, LRR 1-53 Conductivity Controller
46
Alarms and Error Messages
47
Opening the Alarm History - Full List of All Alarms
48
System Settings
49
System Information
49
Setting the Date/Time
50
Password
50
Data Exchange Via Modbus TCP
51
Network Settings
51
VNC Server / Remote Software
52
Configuring the Conductivity Controller
53
Setting the MIN/MAX Switchpoints and Set Point
53
Trend Log
55
Test - Testing the Relays of the Connected Conductivity Controller
56
Continuous Blowdown Valve - Setting the Flushing Interval and Flushing Time
57
Continuous Blowdown Valve - Calibrating the Feedback Potentiometer for the Valve Position Display
58
Calibrating the Conductivity Electrode
59
Setting Correction Factor C
60
Setting the Measuring Range - LRR 1-52
61
Setting the Measuring Range - LRR 1-53
61
Setting the Control Parameters
62
Guide to Setting Control Parameters
62
Setting Automatic Intermittent Blowdown
63
System Malfunctions - URB 55
64
Display of System Malfunctions in the Alarm and Error List Using Fault Codes
64
Common Faults and Issues During Use of the URB 55
65
System Malfunctions - LRR 1-52, LRR 1-53
66
Causes
66
Before Starting Systematic Troubleshooting, Check the Installation and Configuration
66
What to Do in the Event of System Malfunctions
67
Checking Installation and Function
67
Taking the LRR 1-52, LRR 1-53 out of Service
67
Taking the URB 55 out of Service
67
Disposal
68
Returning Decontaminated Equipment
68
EU Declaration of Conformity - LRR 1-52, LRR 1-53
69
EU Declaration of Conformity - URB 55
69
Advertisement
GESTRA URB 55 Original Installation & Operating Manual (72 pages)
Conductivity Controller LRR, Visual Display and Operating Unit URB
Brand:
GESTRA
| Category:
Controller
| Size: 3 MB
Table of Contents
Table of Contents
2
Content of this Manual
5
Scope of Supply, Product Package
5
How to Use this Manual
6
Illustrations and Symbols Used
6
Hazard Symbols in this Manual
6
Types of Warning
7
Specialist Terms, Abbreviations
8
Usage for the Intended Purpose
10
IT Security and Rules for the Use of Ethernet Devices
11
Applicable Standards for the LRR 1-52, LRR 1-53
11
Applicable Standards for the URB 55
12
Improper Use
12
Basic Safety Information
13
Required Personnel Qualifications
13
Notes on Product Liability
13
Function
14
Possible Combinations of Functions and Equipment
14
Technical Data for the LRR 1-52, LRR 1-53
16
Technical Data for the URB 55
18
Factory Settings of the LRR 1-52, LRR 1-53
20
Lrr 1-52
20
Lrr 1-53
20
Lrr 1-52, Lrr 1-53
20
Factory Default Settings of the URB 55
21
Rating Plate, Identification of the LRR 1-52, LRR 1-53
22
Rating Plate, Identification of the URB 55
23
Functional Elements and Dimensions of the LRR 1-52, LRR 1-53
24
Installing the LRR 1-52, LRR 1-53 Conductivity Controller
25
Dimensions of the URB 55
26
Required Installation Aperture in the Control Cabinet Door or Switch Panel
26
Installing the URB 55
27
Connecting the URB 55
28
Ports and Sockets on the Back of the Unit
28
Connection for 24 V DC Supply Voltage - Pin Assignment
28
Pin Assignment of Data Line between URB 55 and LRR 1-52, LRR 1-53
28
Safety Information on the Electrical Connection
29
Wiring Diagram for the LRR 1-52 Conductivity Controller
30
Connecting LRG 16-4 Conductivity Electrodes
30
Connecting an LRG 16-9 Conductivity Electrode
31
Wiring Diagram for the LRR 1-53 Conductivity Controller
32
Connecting an LRGT 1X-X Conductivity Transmitter (4 - 20 Ma)
32
Electrical Connection of the LRR 1-52, LRR 1-53
33
Connecting the 24 V DC Power Supply
33
Connecting the MIN/MAX/CLOSED/OPEN Output Contacts
33
Notes on Connecting Inductive Loads
33
Connecting an LRG 16-9 Conductivity Electrode
33
Connecting an LRGT 1X-X Conductivity Transmitter
34
Connecting the Actual Value/Manipulated Variable Output (4 - 20 Ma)
34
Connecting the Standby Input (24 V DC)
34
Connecting the Potentiometer (0 - 1000 W)
34
Connecting the Data Line between the Conductivity Controller and the URB 55
35
Connecting the Spectormodul Bus System
35
Changing the Equipment Settings
36
Status Display of the LRR 1-52, LRR 1-53
38
Visual Display and Operating Unit URB 55
39
Switching on the Supply Voltage
39
Operation and Navigation
40
User Interface (Example)
40
Color Coding of Input and Status Fields
40
Automatic Functions
41
Entering Parameters Using the Virtual Keypad
41
Entering Parameters with Password Protection
42
Scroll Bar for Long Lists and Menus
42
Icons and Functions of the LRR 1-52, LRR 1-53
43
Home Screen of LRR 1-52, LRR 1-53 Conductivity Controllers
46
Alarm and Fault Indications
47
Opening the Alarm History
48
System Settings
49
System Information
49
Setting the Date/Time
50
Password
50
Network Settings
51
Data Exchange Via Modbus TCP
51
VNC Server / Remote Software
52
Configuring the Conductivity Controller
53
Setting the MIN/MAX Switchpoints and Set Point
53
Trend Log
55
Test - Testing the Relays of the Connected Conductivity Controller
56
Setting the Flushing Interval and Flushing Time of the Continuous Blowdown Valve
57
Calibrating the Feedback Potentiometer for a Display of the Continuous Blowdown Valve Position
58
Calibrating the Conductivity Electrode
59
Setting Correction Factor C
60
Setting the Measuring Range of the LRR 1-52
61
Setting the Measuring Range of the LRR 1-53
61
Setting the Control Parameters
62
Guide to Setting Control Parameters
62
Setting Automatic Intermittent Blowdown
63
System Malfunctions of the URB 55
64
Indication of System Malfunctions in the Alarm and Error List Using Error Codes
64
Common Faults and Issues During Use of the URB 55
65
System Malfunctions of the LRR 1-52, LRR 1-53
66
Causes
66
Check the Installation and Configuration before Systematic Troubleshooting
66
What to Do in the Event of System Malfunctions
67
Check Installation and Function
67
Taking the LRR 1-52, LRR 1-53 out of Service
67
Taking out of Service URB 55
67
Disposal
68
Returning Decontaminated Equipment
68
UL Components
68
GESTRA URB 55 Installation & Operating Manual (68 pages)
Level Controller
Brand:
GESTRA
| Category:
Controller
| Size: 3 MB
Table of Contents
Table of Contents
2
Content of this Manual
5
Scope of Delivery / Product Package
5
How to Use this Manual
6
Illustrations and Symbols Used
6
Hazard Symbols in this Manual
6
Types of Warning
7
Specialist Terms / Abbreviations
8
Usage for the Intended Purpose
9
IT Security and Rules for the Use of Ethernet Devices
10
Applicable Directives and Standards - NRR 2-52, NRR 2-53
10
Applicable Directives and Standards - URB 55
11
Improper Use
11
Basic Safety Notes
12
Required Personnel Qualifications
12
Notes on Product Liability
12
Function
13
Possible Combinations of Functions and Equipment
13
Technical Data - NRR 2-52, NRR 2-53
15
Technical Data - URB 55
17
Factory Settings - NRR 2-52, NRR 2-53
19
Nrr 2-52
19
Nrr 2-53
19
Nrs 2-52 / Nrr 2-53
19
Factory Settings - URB 55
20
Name Plate / Marking - NRR 2-52
21
Name Plate / Marking - NRR 2-53
22
Name Plate / Marking - URB 55
23
Functional Elements and Dimensions - NRR 2-52, NRR 2-53
24
Installing the NRR 2-52, NRR 2-53 Level Controller
25
Dimensions - URB 55
26
Required Installation Aperture in the Control Cabinet Door or Switch Panel
26
Installing the URB 55
27
Connecting the URB 55
28
Ports and Sockets on the Back of the Unit
28
Connection for 24 V DC Supply Voltage - Pin Assignment
28
Pin Assignment of the Data Line between the URB 55 and the NRR 2-52, NRR 2-53
28
Safety Notes for Electrical Connection of the Level Controller
29
Wiring Diagram - NRR 2-52 Level Controller
30
Wiring Diagram - NRR 2-53 Level Controller
31
Electrical Connection - NRR 2-52, NRR 2-53
32
Connecting the 24 V DC Power Supply
32
Connecting the Output Contacts
32
Notes on Connecting Inductive Loads
32
Connecting the Level Electrode/Level Transmitter
32
Connecting the Actual Value Output OUT1 and Analogue Output OUT2 (4 - 20 Ma)
32
Connecting the Digital Input (Terminals 29/30)
32
Connecting the Potentiometer (0 - 1000 W)
32
Connecting the Data Line between the Level Controller and the URB 55
33
Connecting the Spectormodul System
33
Changing the Equipment Settings
34
Setting the Measuring Range
36
Setting the Measuring Range for the NRGT 26-X Level Transmitter
36
Status Display of the NRR 2-52, NRR 2-53
37
Visual Display and Operating Unit URB 55
38
Switching on the Supply Voltage
38
Operation and Navigation
39
User Interface (Example)
39
Colour Coding of Input and Status Fields
39
Automatic Functions
40
Entering Parameters Using the Virtual Keypad
40
Parameter Input with Password Protection
41
Scroll Bar for Long Lists and Menus
41
Icons and Functions - NRR 2-52, NRR 2-53
42
The Home Screen of NRR 2-52, NRR 2-53 Level Controllers
45
Alarms and Error Messages
46
Opening the Alarm History - Full List of All Alarms
47
System Settings
48
Setting the Date / Time
49
Password
49
Network Settings
50
Data Exchange Via Modbus TCP
50
VNC Server / Remote Software
51
Configuring the Level Controller
52
Setting the MIN/MAX Switchpoints and Set Point
52
Automatic / Manual Mode
53
Trend Log
54
Test - Testing the Relays of the Connected Level Controller
55
Valve Calibration in Manual Mode When a Feedback Potentiometer Is Connected
56
Pump Control
57
Calibrating the Boiler Level
58
Setting the Level Controller
59
Guide to Setting Control Parameters
59
Setting the Level Controller for 3-Component Control
60
System Malfunctions - URB 55
61
Display of System Malfunctions in the Alarm and Error List Using Fault Codes
61
Common Faults and Issues During Use of the URB 55
62
System Malfunctions - NRR 2-52, NRR 2-53
63
Causes
63
Before Starting Systematic Troubleshooting, Check the Installation and Configuration
63
What to Do in the Event of System Malfunctions
64
Checking Installation and Function
64
Taking the NRR 2-52, NRR 2-53 out of Service
64
Taking the URB 55 out of Service
64
Disposal
65
Returning Decontaminated Equipment
65
EU Declaration of Conformity - NRR 2-52, NRR 2-53
66
EU Declaration of Conformity - URB 55
66
Advertisement
GESTRA URB 55 Original Installation & Operating Manual (68 pages)
Level Controller NRR Visual Display and Operating Unit URB
Brand:
GESTRA
| Category:
Controller
| Size: 3 MB
Table of Contents
Table of Contents
2
Content of this Manual
5
Scope of Supply, Product Package
5
How to Use this Manual
6
Illustrations and Symbols Used
6
Hazard Symbols in this Manual
6
Types of Warning
7
Specialist Terms, Abbreviations
8
Usage for the Intended Purpose
9
IT Security and Rules for the Use of Ethernet Devices
10
Applicable Directives and Standards - NRR 2-52, NRR 2-53
10
Applicable Directives and Standards - URB 55
11
Improper Use
11
Basic Safety Information
12
Required Personnel Qualifications
12
Notes on Product Liability
12
Function
13
Possible Combinations of Functions and Equipment
13
Technical Data of the NRR 2-52, NRR 2-53
15
Technical Data of the URB 55
17
Factory Default Settings of the NRR 2-52, NRR 2-53
19
Nrr 2-52
19
Nrr 2-53
19
Nrr 2-52, Nrr 2-53
19
Factory Default Settings of the URB 55
20
Rating Plate, Identification of the NRR 2-52
21
Rating Plate, Identification of the NRR 2-53
22
Rating Plate, Identification of the URB 55
23
Functional Elements and Dimensions of the NRR 2-52, NRR 2-53
24
Installing the NRR 2-52, NRR 2-53 Level Controller
25
Dimensions of the URB 55
26
Required Installation Aperture in the Control Cabinet Door or Switch Panel
26
Installing the URB 55
27
Connecting the URB 55
28
Ports and Sockets on the Back of the Unit
28
Connection for 24 V DC Supply Voltage - Pin Assignment
28
Pin Assignment of Data Line between URB 55 and NRR 2-52, NRR 2-53
28
Safety Information for Electrical Connection of the Level Controller
29
Wiring Diagram of the NRR 2-52 Level Controller
30
Wiring Diagram of the NRR 2-53 Level Controller
31
Electrical Connection of the NRR 2-52, NRR 2-53
32
Connecting the 24 V DC Power Supply
32
Connecting the Output Contacts
32
Notes on Connecting Inductive Loads
32
Connecting the Level Electrode/Level Transmitter
32
Connecting the Actual Value Output OUT1 and Analog Output OUT2 (4 - 20 Ma)
32
Connecting the Digital Input (Terminals 29/30)
32
Connecting the Potentiometer (0 - 1000 W)
32
Connecting the Data Line between the Level Controller and the URB 55
33
Connecting the Spectormodul System
33
Changing the Equipment Settings
34
Setting the Measuring Range
36
Setting the Measuring Range for the NRGT 26-2 Level Transmitter
36
Status Display of the NRR 2-52, NRR 2-53
37
Visual Display and Operating Unit URB 55
38
Switching on the Supply Voltage
38
Operation and Navigation
39
User Interface (Example)
39
Color Coding of Input and Status Fields
39
Automatic Functions
40
Entering Parameters Using the Virtual Keypad
40
Entering Parameters with Password Protection
41
Scroll Bar for Long Lists and Menus
41
Icons and Functions of the NRR 2-52, NRR 2-53
42
Home Screen of NRR 2-52, NRR 2-53 Level Controllers
45
Alarm and Fault Indications
46
Opening the Alarm History
47
System Settings
48
System Information
48
Setting the Date/Time
49
Password
49
Network Settings
50
Data Exchange Via Modbus TCP
50
VNC Server / Remote Software
51
Configuring the Level Controller
52
Setting the MIN/MAX Switchpoints and Set Point
52
Automatic/Manual Mode
53
Trend Log
54
Test - Testing the Relays of the Connected Level Controller
55
Valve Calibration in Manual Mode When a Feedback Potentiometer Is Connected
56
Pump Control
57
Calibrate the Boiler Level (for NRG2
58
Setting the Level Controller
59
Guide to Setting Control Parameters
59
Setting the Level Controller for 3-Element Control
60
System Malfunctions in the URB 55
61
Indication of System Malfunctions in the Alarm and Error List Using Error Codes
61
Common Faults and Issues During Use of the URB 55
62
System Malfunctions in the NRR 2-52, NRR 2-53
63
Causes
63
Check the Installation and Configuration before Systematic Troubleshooting
63
What to Do in the Event of System Malfunctions
64
Checking Installation and Function
64
Taking the NRR 2-52, NRR 2-53 out of Service
64
Taking out of Service URB 55
64
UL Components
65
Disposal
65
Advertisement
Related Products
GESTRA URB 50
GESTRA URB 1
GESTRA URS 2
GESTRA URN 2
GESTRA URB 60
GESTRA URS 60
GESTRA URS 61
GESTRA UNA 38
GESTRA UNA45MAX
GESTRA UNA46MAX
GESTRA Categories
Switch
Control Unit
Controller
Measuring Instruments
Industrial Equipment
More GESTRA Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL