Sign In
Upload
Manuals
Brands
Buchi Manuals
Dryer
Lyovapor L-300 Pro
Buchi Lyovapor L-300 Pro Manuals
Manuals and User Guides for Buchi Lyovapor L-300 Pro. We have
2
Buchi Lyovapor L-300 Pro manuals available for free PDF download: Operation Manual
Buchi Lyovapor L-300 Pro Operation Manual (118 pages)
Brand:
Buchi
| Category:
Laboratory Equipment
| Size: 16.17 MB
Table of Contents
Table of Contents
3
About this Document
7
Connected Devices
7
Warning Notices in this Document
7
Symbols
7
Warning Symbols
7
Mark-Ups and Symbols
8
Trademarks
8
Safety
9
Proper Use
9
Use Other than that Intended
9
Staff Qualification
9
Location of Warning Signs on the Product
10
Location of Warning Signs on the Product (Front View)
10
Location of Warning Signs on the Product (Rear View)
10
Location of Warning Signs on the Ice Condenser
11
Residual Risks
12
Faults During Operation
12
Glass and Acrylic Breakage
12
Low Internal Pressure
12
Cold and Hot Surfaces
12
Personal Protective Equipment
12
Modifications
13
Product Description
14
Description of Function
14
Freezing Phase
14
Main Drying Phase
14
Secondary-Drying Phase
15
Configuration
15
Front View
15
Rear View
17
Side Connections
18
Control Panel
19
Pro Control Panel
19
Type Plate
19
Scope of Delivery
20
Refrigerant Specification
20
Refrigerant Specification (Low Temperature)
20
Refrigerant Specification (High Temperature)
21
Technical Data
21
Lyovapor™ L-300
22
Ambient Conditions
23
Materials
23
Transport and Storage
25
Transport
25
Storage
25
Installation
26
Installation Site
26
Putting the Instrument in Operation
27
Preparing the Instrument
27
Establishing Electrical Connections
27
Fitting the Fresh Water Connections
28
Fitting Fill-Level Sensor in Water Tank (Optional)
29
Fitting the Drain Tubes
29
Fitting the Fill-Level Sensor on the Receiving Vessel (Optional)
30
Connecting the Coolant
31
Fitting Pressure Sensors (Option)
31
Connecting Inert Gas (Option)
33
Fitting an Air Filter (Option)
34
Commissioning the Vacuum Pump
35
Establishing LAN Connection
35
Requirements for Local Network Settings
35
Preparing the Instrument for App Using
36
Enabling BUCHI Cloud Access
36
Insert SD Card (Pro Control Panel Only)
36
Operating the Control Panel
38
Layout of the Control Panel
38
Function Bar
39
Menu Bar
39
Start Menu
40
Favourites Menu
40
Configuration Menu
40
Messages Menu
46
Status Bar
47
Carrying out Freeze-Drying
48
Preparing the Instrument
48
Starting Freeze-Drying
49
Editing Parameters While the Process Is Running
49
Ending Freeze-Drying
50
Shutting down the Instrument
50
Switching off the Instrument
51
Operating Pro Control Panel
52
Layout of Pro Control Panel
52
Function Bar
52
Other Symbols on the Control Panel
54
Menu Bar
54
Start Menu
54
Favourites Menu
55
Method Menu
55
Configuration Menu
55
Messages Menu
61
Status Bar
62
Editing a Method
64
Creating a New Method
64
Changing the Name of a Method
64
Setting the Sample Collapse Temperature
65
Setting the Gas Type
65
Setting the Shelf Loading Temperature
65
Setting the Steps of a Method
66
Setting the Phases of a Method
67
Deleting a Method
69
Setting End Point Definitions
69
Pressure Difference Test
70
Temperature Difference Test
71
Pressure Rise Test
72
Performing Freeze-Drying Using a Method [Pro Control Panel]
74
Preparing the Instrument
74
Selecting a Method
74
Starting Freeze-Drying
75
Changing Parameters While the Process Is Running
76
Ending Freeze-Drying
76
Shutting down the Instrument
76
Switching off the Instrument
77
Performing Freeze-Drying Manually [Pro Control Panel]
77
7.10.1 Preparing the Instrument
77
7.10.2 Starting Freeze-Drying
77
7.10.3 Editing Parameters While the Process Is Running
78
7.10.4 End Point Definition
78
7.10.5 Ending Freeze-Drying
79
7.10.6 Shutting down the Instrument
79
7.10.7 Switching off the Instrument
80
Operating Top-Mount Drying Racks
81
Operating Stoppering Acrylic Drying Chamber
81
Operating Manifold Acrylic Drying Chamber (Heatable Shelves)
84
Operating Manifold Acrylic Drying Chamber (Non-Heatable Shelf)
87
Operating Acrylic Drying Chamber (Heatable Shelf)
90
Operating Acrylic Drying Chamber (Non-Heatable Shelf)
92
Operating Manifold Drying Rack
94
Determining the Number of Flasks
96
Operating Manifold Valves
96
Cleaning and Servicing
97
Regular Maintenance Work
97
Performing a Vacuum Test
98
Performing a Leak Test
99
Performing a Leak Test with a Drying Chamber
99
Performing Leak Test with a Manifold Drying Rack
101
Cleaning the Ice Condenser
103
Help with Faults
104
Troubleshooting
104
Faults, Possible Causes and Remedies
104
Locating Leaking Manifold Valve
105
Manually Defrosting Ice Condenser
105
Error Messages
106
Taking out of Service and Disposal
110
Disposal
110
Returning the Instrument
110
Appendix
111
Spare Parts and Accessories
111
12.1.1 Accessories
111
12.1.2 Further Accessories
111
12.1.3 Spare Parts
112
12.1.4 Top-Mount Drying Rack Accessories
114
12.1.5 Software
116
Advertisement
Buchi Lyovapor L-300 Pro Operation Manual (106 pages)
Brand:
Buchi
| Category:
Dryer
| Size: 13.44 MB
Table of Contents
Table of Contents
3
1 About this Document
7
Connected Devices
7
Warning Notices in this Document
7
Symbols
7
Warning Symbols
7
Mark-Ups and Symbols
8
Trademarks
8
2 Safety
9
Proper Use
9
Use Other than that Intended
9
Staff Qualification
9
Location of Warning Signs on the Product
10
Location of Warning Signs on the Product (Front View)
10
Location of Warning Signs on the Product (Rear View)
10
Location of Warning Signs on the Ice Condenser
11
Residual Risks
11
Faults During Operation
12
Glass and Acrylic Breakage
12
Low Internal Pressure
12
Cold and Hot Surfaces
12
Personal Protective Equipment
12
Modifications
12
3 Product Description
13
Description of Function
13
Freezing Phase
13
Main Drying Phase
13
Secondary-Drying Phase
14
Configuration
14
Front View
14
Rear View
16
Side Connections
16
Control Panel
17
Pro Control Panel
18
Type Plate
18
Scope of Delivery
19
Refrigerant Specification
19
Refrigerant Specification (Low Temperature)
19
Refrigerant Specification (High Temperature)
19
Technical Data
19
Lyovapor™ L-300
20
Ambient Conditions
21
Materials
21
4 Transport and Storage
22
Transport
22
Storage
22
5 Installation
23
Installation Site
23
Putting the Instrument in Operation
24
Preparing the Instrument
24
Establishing Electrical Connections
24
Fitting the Fresh Water Connections
25
Fitting Fill-Level Sensor in Water Tank (Optional)
26
Fitting the Drain Tubes
26
Fitting the Fill-Level Sensor on the Receiving Vessel (Optional)
27
Connecting the Coolant
28
Fitting Pressure Sensors (Option)
28
Connecting Inert Gas (Option)
30
Fitting an Air Filter (Option)
31
Commissioning the Vacuum Pump
31
Establishing LAN Connection
32
Requirements for Local Network Settings
32
Preparing the Instrument for App Using
33
Enabling BUCHI Cloud Access
33
Insert SD Card (Pro Control Panel Only)
33
6 Operating the Control Panel
35
Layout of the Control Panel
35
Function Bar
35
Menu Bar
36
Start Menu
37
Favourites Menu
37
Configuration Menu
37
Messages Menu
37
Status Bar
43
Carrying out Freeze-Drying
44
Preparing the Instrument
44
Starting Freeze-Drying
45
Editing Parameters While the Process Is Running
45
Ending Freeze-Drying
45
Shutting down the Instrument
46
7 Operating Pro Control Panel
47
Layout of Pro Control Panel
47
Function Bar
47
Other Symbols on the Control Panel
49
Menu Bar
49
Start Menu
49
Favourites Menu
49
Method Menu
49
Configuration Menu
49
Messages Menu
55
Status Bar
56
Editing a Method
57
Creating a New Method
58
Changing the Name of a Method
58
Setting the Sample Collapse Temperature
58
Setting the Gas Type
59
Setting the Shelf Loading Temperature
59
Setting the Steps of a Method
59
Setting the Phases of a Method
61
Deleting a Method
63
Setting End Point Definitions
63
Pressure Difference Test
63
Temperature Difference Test
64
Pressure Rise Test
65
Performing Freeze-Drying Using a Method [Pro Control Panel]
67
Preparing the Instrument
67
Selecting a Method
67
Starting Freeze-Drying
67
Changing Parameters While the Process Is Running
68
Ending Freeze-Drying
68
Shutting down the Instrument
69
Switching off the Instrument
69
Performing Freeze-Drying Manually [Pro Control Panel]
69
Preparing the Instrument
69
Starting Freeze-Drying
70
Editing Parameters While the Process Is Running
70
End Point Definition
71
Ending Freeze-Drying
71
Shutting down the Instrument
71
Switching off the Instrument
72
8 Operating Top-Mount Drying Racks
73
Operating Stoppering Acrylic Drying Chamber
73
Operating Manifold Acrylic Drying Chamber (Heatable Shelves)
76
Operating Manifold Acrylic Drying Chamber (Non-Heatable Shelf)
79
Operating Acrylic Drying Chamber (Heatable Shelf)
81
Operating Acrylic Drying Chamber (Non-Heatable Shelf)
83
Operating Manifold Drying Rack
85
Determining the Number of Flasks
86
Operating Manifold Valves
87
9 Cleaning and Servicing
88
Regular Maintenance Work
88
Performing a Vacuum Test
89
Performing a Leak Test
90
Performing a Leak Test with a Drying Chamber
90
Performing Leak Test with a Manifold Drying Rack
92
Cleaning the Ice Condenser
93
10 Help with Faults
95
Troubleshooting
95
Faults, Possible Causes and Remedies
95
Locating Leaking Manifold Valve
96
Manually Defrosting Ice Condenser
96
11 Taking out of Service and Disposal
97
Disposal
97
Returning the Instrument
97
12 Appendix
98
Spare Parts and Accessories
98
Accessories
98
Further Accessories
98
Spare Parts
99
Top-Mount Drying Rack Accessories
101
Software
104
Advertisement
Related Products
Buchi Lyovapor L-300
Buchi Lyovapor L-200
Buchi Lyovapor L-200 Pro
Buchi B-191
Buchi B-290
Buchi Nano B-90
Buchi Categories
Laboratory Equipment
Water Pump
Chiller
Industrial Equipment
Dryer
More Buchi Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL