Piper Cherokee Arrow II Pilots Operating Manual page 7

Table of Contents

Advertisement

ARROW I1
PILOT'S OPERATING MANUAL LOG OF REVISIONS (cont)
Rev. 5 (cont)
Rev. 6
-
761 578
(PR75 1208)
Rev. 7
-
761 578
(PR7607
1
2)
Rev. 8
-
761 578
(PR770228)
Rev. 9
-
761 578
(PR790413)
4-4
WIB
7-4
7-8
7-9
8-2
2-3
A FIM
W/B
7-9
7-10
7-1 1
8-2
W/B
7-10
1-2
2-2
2-20
A F/M
W/B
7-10
2-1 1
2-1 8
W/B
7-8
7-9
10-8
Description
Revised Power Off Landing info; added new
item 1. and revised existing item nos. under
Gear Down Landing; revised Gear Down
Landing Note.
Added Rev. 4 to Report VB-549.
Added new item 11. and revised existing
item nos. under Takeoff.
Revised ELT info.
Added revised ELT info.
Revised item 14. (Fuel Warning Placard) and
added new item 17.
Revised Landing Gear info.
Added Rev. 4 to Report VB-560.
Added Rev. 5 to Report: VB-549.
Revised ELT remote switch info; relocated
material to page 7- 10.
Added material relocated from page 7-9;
relocated material to page 7-1 1.
Added material relocated from page 7-10.
Revised item 14 (Fuel Warning).
Added Rev. 6 to Report: VB-549.
Revised pilot's remote switch description;
revised existing data.
Added Lycorning 10-360-C1C6 Power Plant
and McCauley Propeller.
Added 10-360-C 1 C6 Engine and footnotes;
revised prop. description.
Revised seat retainer description.
Added Rev. 5 to Report: VB-560.
Added Rev. 7 to Report: VB-549.
Revised ELT Note.
Removed Note; added Warning.
Added Caution.
Added Rev. 8 to Report: VB-549.
Revised ELT info.
Revised ELT info.
Added Caution; relocated info. to
pg. 10-9.
Date
P
Dec. 8,1975
July 22,1976
Feb. 28,1977
April 13, 1979

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents