Before leaving our factory, every machine is thoroughly tested. Follow the instructions strictly and
your machine will give you long service in normal operating conditions.
Before starting up the machine, make sure you read this entire Operation's Manual and are familiar
with the operation of the machine.
WITH MACHINE COLD AND SETTING LEVEL:
1. Electric Models: Verify all electrical connections are intact.
1 - 2 HOUR OPERATION CHECK LIST:
ALWAYS place the machine on a level surface with the engine/motor "OFF", the ignition switch set
in the "OFF" position and disconnected from the power source before performing any maintenance.
Let the machine cool down!
SCHEDULED MAINTENANCE QUICK REFERENCE:
Before performing any maintenance, ALWAYS place the machine on a level surface with the
engine/motor "OFF" and the ignition switch set in the "OFF" position.
23
MAINTENANCE
PRE OPERATION CHECKLIST
SERVICE DAILY:
1. Check blade guard for damage.
2. Check clamps for damage or looseness. Tighten or replace as necessary.
We carry out all repairs in the shortest possible time and at
the most economical prices. See inside back cover for our
address and telephone numbers.
The instructions for use found in this document
are for information only and are not binding. As part of our product
quality improvement policy, we reserve the right to make any and
all technical modifications without prior notice.
The manufacturer accepts no
responsibility caused by unsuitable
use or modifications.