Safety Information - Dunkirk D249 Series Installation, Operation & Maintenance Manual

Cast iron commercial natural gas steam boiler
Hide thumbs Also See for D249 Series:
Table of Contents

Advertisement

Safety Information

IMPORTANT: Read the following instructions
COMPLETELY before installing!!
!
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death
or serious injury. Read this manual and understand
all requirements before beginning installation.
!
WARNING
Keep boiler area clear and free from combustible
materials, gasoline and other flammable vapors
and liquids.
DO NOT obstruct air openings to the boiler room.
Modification, substitution or elimination of factory
equipped, supplied or specified components may
result in personal injury or loss of life.
TO THE OWNER - Installation and service of this
boiler must be performed by a qualified installer.
TO THE INSTALLER - Leave all instructions with
boiler for future reference.
When this product is installed in the
Commonwealth of Massachusetts the installation
must be performed by a Licensed Plumber or
Licensed Gas Fitter.
1.
Never test for leaks with an open flame. Use soap suds
to check all connections. This will avoid any possibility
of fire or explosion.
2.
Boiler is configured for operation with natural gas.
Over-firing will result in premature failure of boiler
sections and cause dangerous operation. Verify there is
adequate gas supply piping.
3.
Never vent this boiler into enclosed space. Always
connect boiler to chimney and vent to outside. Never
vent to another room or inside abuilding.
4.
Verify there is adequate air supply for complete
combustion.
5.
Follow regular service and maintenance schedule for
efficient and safe operation.
!
WARNING
Fire hazard. Do not install boiler on non-combustible
flooring such as carpeting or wood flooring. Failure
to follow these instructions could result in death or
serious injury.
6.
DO NOT install boiler on non-combustible flooring such
as carpeting or wood flooring.
SAFETY INFORMATION
When Your Boiler Arrives
When boiler arrives be sure to save and refer to
instructions.
Inspect each item received for visible damage. If any
parts are damaged, report this to freight company
immediately and request them to call and make
inspection before you make any installation. Have
inspector prepare a signed report. Send copy of
report to manufacturer.
We must have the signed inspection report of the
freight company to prove their liability.
Read these instructions carefully before beginning
the installation to be sure all packages have been
received. It is recommended that you follow the
step-by-step instructions for best assembly results.
Before discarding any packing material carefully
examine for loose parts. Also store all parts received
where they will not be lost or damaged.
Codes Governing Installation
Installation must conform to the requirements of the
authority having jurisdiction or, in the absence of
such requirements, to the National Fuel Gas Code,
ANSI Z223.1/NFPA54.
Where required by the authority having jurisdiction, the
installation must conform to the standard for Controls
and Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1. Additional controls and safety
devices are required for CSD-1.
Installation
Boiler is designed to provide wide heating capacity range
with multiple burner modules, each equipped with its own
set of controls. For purposes of orientation, gas manifold
location is considered the front. Instructions are written
for assembly of boiler starting with left side and working to
right side.
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents