Chapter 6 Pass / Fail Criteria - DEC DECpc LPx Service Maintenance Manual

Table of Contents

Advertisement

Digital DECpc LPx/LPx+
Chapter 6
As Final Acceptance Test the following tests should be run to meet the Pass/Fail criteria:
1)
Successful completion of the POST tests.
2)
Successful completion of the following QAPLUS/fe module tests (one pass):
System Board
Memory
Video
♦ ♦
Hard Disk
Floppy Disk
Keyboard
COM Ports
LPT Ports
Pointer Device
3)
Successful bootstrap of the on the computer installed Operating System.
Operating Systems Supported:
MS-DOS version 5.0 and later
OS/2 version 2.0 and later
SCO Open Desktop Release 3
Windows NT (DECpc LPx+ with 12 MB client/ 16 MB server memory minimum
recommended)
SCO UNIX System V release 2.0 and later
Remove any software that was put on the hard drive to enable repair of the system before shipping.
When completed carefully clean the outside of the unit with cleaning solution.
MCS Logistics Engineering - Nijmegen
(all tests)
(all tests)
(all tests)
(all tests, except: Sequential write/read (destructive test !!) and
Sequential write/random read (destructive test !!))
(all tests)
(all tests)
(all tests)
(all tests)
(all tests)
Pass / Fail Criteria
Pass / Fail Criteria
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents