Power Up Your Cellular Booster - Uniden U2 Instruction Manual

Hide thumbs Also See for U2:
Table of Contents

Advertisement

Contact Tech Support 7 days a week at 1.800.215.7015 or email at support@unidencellularbooster.com
INSTALL YOUR CELLULAR BOOSTER
Install the cellular booster in a location that is properly ventilated and not
exposed to excessive heat, moisture and/or direct sunlight. The optimal area
would be on a wall located near a power outlet.
It should be mounted in an easily accessible area so it's easy to perform general
maintenance with the coaxial cable connections, dip switch settings and power
adaptor.
Make sure all cables and antennas are securely connected before commissioning
the system.

POWER UP YOUR CELLULAR BOOSTER

Once all the next page precautions have been taken, power on the cellular booster.
The LED indicator marked power should light up green.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

U4U4pU60U65U65xU65-4g-aws ... Show all

Table of Contents