Base Station Installation
6
Finish
Chap. 4.5
Connect the wire
Power Box Installation
11
9
10
One-Time Setup
12
Turn Safety Switch ON
16
Set Lawn Size
Chap. 5.2.4
Press OK
7
Connect the Plot Connector
Chap. 4.6
13
Operating Panel
Chap. 5.2.1
Scroll
17
Test Base Station Position
Chap. 5.2.5
Press OK
9
Chap. 4.6
Mount
Bracket
Choose / Confirm
Scroll
Back / Cancel
Possible Error
Messages:
Confirm steps 7,10,11
Swap wires in
plot connector
8
Insert 2 Pegs
Chap. 4.6
10
Chap. 4.7
15cm extension cable
11
Chap. 4.7
14
Choose Measurements Units
Chap. 5.2.2
Meter
Celsius
24 Hours
15
Set Day & Time
Chap. 5.2.3
18
Peg Base
Chap. 5.2.5
Reposition
Base Station
Connect
Foot
Fahrenheit
12 hours (AM / PM)
Press OK
Need help?
Do you have a question about the RC series and is the answer not in the manual?