An Accessory Storage Drawer - GE Advantium PSB9240 Installation Instructions Manual

Built-in speedcook ovens
Hide thumbs Also See for Advantium PSB9240:
Table of Contents

Advertisement

Preparation
PREPARE THE OPENING
Installation over a GE/Monogram Oven:
23-1/2"
30"
25-1/4"
17-1/2"
45-1/4"
Min.
double oven with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2" minimum shown.
Installation Preparation
WITHOUT

an Accessory Storage Drawer

(CONT.)
Construct Solid
Bottom Min.
3/8" Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
7
PREPARE THE OPENING
Installation over a GE/Monogram Oven and
Warming Drawer:
30"
23-1/2"
25-1/4"
17-1/2"
45-1/4"
Min.
Per warming drawer requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION:
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.
PRECAUCIÓN:
personal, la superficie de montaje debe poder
soportar la carga del gabinete, además del peso
aproximado de 80 libras del horno, más las
cargas adicionales del horno de hasta 50 libras
o un peso total de hasta 130 libras.
(CONT.)
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
2" Min.
Para seguridad

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advantium zsc2200Advantium zsc2202Advantium zsc2201

Table of Contents