An Accessory Storage Drawer - GE PSB9240DFBB Installation Instructions Manual

Advantium 240v built-in speedcook ovens
Hide thumbs Also See for PSB9240DFBB:
Table of Contents

Advertisement

Available languages

Available languages

Preparation
PREPARE THE OPENING
The Advantium 240V can be installed in
combination with other GE/Monogram appliances.
Always follow each product's Installation
Instructions to complete the installation.
Single Advantium 240V Installation:
Order a 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30"
17-1/2"
36-3/4"
Min.
the floor to the cutout in any single or combined
installation.
7/8" overlap on the bottom of the opening for
all models. Allow 1-1/4" case trim overlap on the
top for models PSB9120 and 3/4" overlap on the
top for models ZSC2200, ZSC2200, ZSC2201 and
ZSC2202.
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 240V and the other
appliance overlaps.
Construct a solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
flush with the bottom edge of the cutout.
Installation Preparation
WITHOUT
23-1/2"
25-1/4"
Construct
Base
Min. 3/8"
Plywood
Supported
by 2x4 or
2x2 Runners
all Four
Sides

an Accessory Storage Drawer

PREPARE THE OPENING
Installation over a GE/Monogram
Warming Drawer:
30"
17-1/2"
36-3/4"
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
6
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by 2x4 or 2x2
25-1/4"
Runners all
Four Sides
2" Min.
(3" recommended)
Per warming
drawer
requirement

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents