Samsung DVD-V5600 Service Manual page 41

Hide thumbs Also See for DVD-V5600:
Table of Contents

Advertisement

4-4-9 Gear Loading Drive, Slider Cam,
Ass'y Lever Load S, T Removal
1) Remove the Belt Pulley. (Refer to Fig. 4-38)
2) Remove the Gear Loading Drive Πafter releasing
Hook [A] in the direction arrow as shown in detail
drawing.
3) Remove the Slider Cam ´.
4) Remove the Ass'y Lever Load S ˇ & Ass'y Lever
Load T ¨.
HOOK(A)
´ SLIDE CAM
Fig. 4-21 Gear Loading Drive, Slider Cam,
Ass'y Lever T, S Load Removal
Samsung Electronics
ΠGEAR LOADING DRIVE
¨ ASS'Y LEVER LOAD T
ˇ ASS'Y LEVER
LOAD S
4-4-10 Gear Loading Drive, Slider Cam,
Ass'y Lever Load S, T Assembly
1) When reinstalling, be sure to align dot of Ass'y
Lever Load T Πwith dot of Ass'y Lever Load S
´ as shown in drawing, (Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam ˇ hole,
3) Be sure to align dot of Ass'y Lever Load T Πand
dot of Gear Loading Drive ¨, (Refer to Timing
Point 2).
4) Aline dot of Gear Loading drive ¨ with mark of
Slider Cam ˇ as shown in drawing(Refer to
Timing Point 3).
TIMING POINT 1
ΠLEVER LOAD T
TIMING POINT 2
TIMING POINT 3
PIN A
PIN C
Fig.4-22 Gear Loading Drive, Slider Cam,
Ass'y Lever Load S, T Assembly
Disassembly and Reassembly
´ LEVER LOAD S
PIN D
PIN B
ˇ SLIDER CAM
4-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents