Download Print this page

Installation - AEG Perfekt Visor?24 Instruction Manual

Range hood
Hide thumbs Also See for Perfekt Visor?24:

Advertisement

 
Cleaning & Maintenance 
 
1. Clean the surface of the hood every week with mild 
soap or detergent. Avoid solvents, acid, alkali, scouring 
pads or powder that could irreparably damage the 
stainless steel surface 
2. The grease filters may be washed using mild soap, 
detergent or degreasing agents 
3. The charcoal filters cannot be cleaned and bust be 
generally replaced after 6 months of use 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
11 | P a g e
 
 
Installation (duct is not supplied) 
                                                       
1. The range hood should be 
mounted at a distance of 
650mm from an electric or 
induction cooktop and 
700mm from a gas cooktop 
for optimum performance. If 
the instructions for 
installation of the gas 
cooktop specify a greater 
distance, this has to be taken 
into account (see pic 1). The exhaust 
air must not be discharged into a 
chimney which is used for exhausting fumes from 
other appliances burning gas or other fuels 
2. This item should be fitted by a competent person or 
fitter who should only use the right screw fixing where 
applies 
3. To install, drill 2 holes of Ø8mm on a sturdy wall and in 
line with the hood (see pic 2a). Or drill 4 holes of 
Ø8mm on the lower side of the cupboard in line with 
the hood(see pic 2b),detailed installation procedure 
please see pic 4,5,6 
4. Insert expanding screws into the hole if use the way as 
pic 2a 
5. Attach the duct to the one way valve, and connect it to 
the kitchen outlet vent. (see pic 3) 
6.  Do not connect to a common vent with other 
appliance such as gas heater, water heater, laundry 
dryer etc. 
 
Pic 1
4 | P a g e
 

Advertisement

loading

This manual is also suitable for:

Perfekt visor?30