Caution; Before Operation; Before Using - Sharp SJ-FR23C Operation Manual

Refrigerator-freezer
Table of Contents

Advertisement

BEFORE OPERATION

■ Installation
Make sure there is sufficient space
for ventilation.
10cm at least
6cm at least
(Front View)
Figure shown above is the minumum required space for installation.

■ Before Using

1
Fix the adjustable foot
(only the left one)
Adjustable Foot
4
Do not store any food until
the refrigerator starts cooling.
Do not open the door until the
refrigerator starts cooling.
Usually the cooling period is 2 to 3 hours,
while it will last 10 hours in summer.
■ In Delivery
Please take out all the foods
inside before moving the refrigerator.
Take out the plug.
Put a cushion on the delivery path.
Otherwise, the water spilled from
the evaporation pan in delivery will
dirt the floor.
Please leave space for ventilation.
6cm at least
(Lateral View)
2
Clean the inside
Clean with a wet cloth
and wipe off the water
with a dry one.

Caution

Plastic odor will be smelled
in the beginning.Please keep
in good ventilation to remove
the odor.
Please lift the refrigerator up when
moving since there is no casters.
Do not locate the refrigerator laterally.
Otherwise it will cause damage to mechenical
parts and stop cooling.
Caution
Position the refrigerator where the plug is
accessiable.
Do not locate the refrigerator near any
heating equipment like a gas furnace or
direct sunlight, otherwise it will lead to
decrease of cooling capacility and fading of
color;near a TV set, radio, telephone, wired
intercom, otherwise it will cause damage to
fidelity and picture.
It may dirt, change color and/or shape of
the wall and ground near the refrigerator
when the refrigerator releases heat.
Please pave a plank on carpet or PVC floor
before positioning the refrigerator.
3
Plug into the socket
Plug into the socket after
locating the refrigerator.
Fix with tapes
  
  
3

Advertisement

Table of Contents
loading

Table of Contents