Low Water Cutoff (If Equipped); Typical Heating Boiler Installations - Lochinvar 000 - 500 Installation & Service Manual

90,000 - 500,000 btu/hr
Table of Contents

Advertisement

4
Hydronic piping
A water flow switch meets most code re quire ments for a
low-water cut off device on boil ers requiring forced
cir cu la tion for operation.

Low Water Cutoff (if equipped)

A hot water boiler installed above radiation level must be
provided with a low water cutoff device either as part of the
unit or installed at the time the boiler is installed. An
electronic low water cutoff is available as a kit on all units.
Low water cutoffs should be in spect ed every six months,
including flushing of float types.
TABLE - 4A
MINIMUM REQUIRED FLOW
FOR HEATING BOILER
Input Btu/hr
315,000
360,000
399,999
500,000
Minimum flow is based on a 40°F
NOTICE
temper a ture rise across the boiler.
Minimum flow may not prove a flow
switch installed in the boiler piping. Use
care when operating a boiler at or near
the min i mum recommended flow
because conditions unique to the
installation (system pressure, operation
of multiple zone valves, glycol, variations
in flow, etc.,) may result in overheating
of the boiler water caus ing noise or
nuisance operation of safety limit con -
trols. Typical heat ing boiler applications
will op er ate with a 20°F to 30°F
temperature rise across the boiler.
(continued)

Typical Heating Boiler Installations

General Plumbing Rules
1.
2.
3.
4.
5.
6.
Placing the Boiler in Operation
Filling the System: All air must be purged from the system for
proper operation. An air scoop and air vent must be located
GPM Flow
close to the boiler outlet and there should be a minimum
13
distance between the cold water feed and the system purge valve.
14.9
1.
16.5
20.7
2.
3.
4.
5.
6.
7.
8.
Installation & Service Manual
Check all local codes.
For serviceability of the boiler, always install unions.
Always pipe pressure relief valves to an open drain.
Locate system air vents at the highest point of the system.
Expansion tank must be installed near the boil er and on
the suction side of the pump.
Support all water piping.
Close all drain cocks and air vents.
Open the makeup water valve and slowly fill the system.
If a makeup water pump is employed, ad just the pressure to
provide a minimum of 12 psi at the highest point in the
system. If a pressure regulator is also installed in the line,
it should be adjusted to the same pressure.
Close all valves. Purge one circuit at a time as follows:
A. Open one circuit drain valve and let the water drain for
at least five minutes. Ensure that there are no air
bubbles visible in the wa ter stream before closing the
drain valve.
B. Repeat this procedure for each circuit.
Open all valves after all circuits have been purged. Make
sure there are no system leaks.
Do not use petroleum based stop leak
NOTICE
products.
repaired.
make-up water can cause damage to the
boiler heat exchanger due to scale
accumulation.
heat transfer, causing overheating of the
heat exchanger.
Run the system circulating pump for a min i mum of 30
minutes with the boiler turned off.
Open all strainers in the system and check for debris.
Recheck all air vents as described in step 4, General
Plumbing Rules.
All system leaks must be
The constant addition of
Scale reduces flow and
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents