OPERATOR INSTALLATION

STEP 1. Weld the base plate onto the 4"x 4" post as shown. The slotted holes
should be perpendicular to the gate.
The base plate should be level and parallel to the gate.
STEP 2. Bolt the main chassis on to the base plate using the four 3/8"
bolts, washers, lock washers and nuts.
STEP 3. Assemble chain bracket
with 5/16" U-bolt & hardware to each
end of the gate as shown. Do not
tighten at this time.
STEP 4. Align both chain bracket slots with the bottom teeth of the idler
sprockets.
Tighten all hardware.