OPERATOR INSTALLATION
STEP 1. Install two 3" dia. Posts parallel to the gate as shown. Posts height depends on height
preference of operator.
Gate
F e n c e
5"
6"
24"
Inside posts
D r i v e w a y
STEP 2. Remove chain cover and front lid. Mount to posts using the four supplied 3" U-bolts
7