Operator Installation - Apollo 7200ETL Installation Manual

Slide gate operator
Table of Contents

Advertisement

OPERATOR INSTALLATION

STEP 1. Install two 3" dia. Posts parallel to the gate as shown. Posts height depends on height
preference of operator.
Gate
F e n c e
5"
6"
24"
Inside posts
D r i v e w a y
STEP 2. Remove chain cover and front lid. Mount to posts using the four supplied 3" U-bolts
7

Advertisement

Table of Contents
loading

Table of Contents