Chain Tensioning - U.S.SAWS ACH GB-16 Operating Manual

Air powered chain saw
Hide thumbs Also See for ACH GB-16:
Table of Contents

Advertisement

Reciever Pin Mounting Instructions
• Remove the rear bar stud nut.
• Install pin on rear bar stud.
• The inner thread of the pin will take the place of the nut.
• In certain applications (larger than 10" pipe) the mounting pin
may need to be relocated to the front bar stud for greater saw
clearance.
• Ensure the chain is adjusted according to the chain tensioning
guide.
Read and understand instructions provided with the saw and/or
pipe clamp before using this device. Use caution not to drop saw or
strike mounting pin as damage to the chain tensioning mechanism
can occur.
Pipe Clamp
Air Powered Chain Saw
11

Advertisement

Table of Contents
loading

Table of Contents