Assembly - Husqvarna ST 111 Operator's Manual

Table of Contents

Advertisement

Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1.
No parts required
2.
Carriage bolts
Flange nuts
Washers
Knob
Chute
Deflector
3.
Screw
4.
No parts required
1. Unfolding the Handle
Procedure
1. Lift operator handle up to the desired height, and close
adjustment lever ensuring the positioning pin on the
lower handle engages one of the three holes on the
upper handle (Figure 2).
2
3
4
1. Handle
2. Handle adjustment lever
3. Positioning pin
4. Upper handle adjustment hole
Description
2
Figure 2

ASSEMBLY

Qty.
Unfold the handle.
5
Install the discharge chute.
4
Install the discharge chute.
2
Install the discharge chute.
1
Install the discharge chute.
1
Install the discharge chute.
1
Install the discharge chute.
4
Install the upper handle cover.
Filling the engine with oil
2. Pull up and push down slightly on the handle to verify
handle is locked into place (Figure 3).
NOTE: If handle feels unsecure with the adjustment
levers closed, tighten adjustment handle nuts until the
handle feels secure.
3. Remove the cardboard from recoil start handle and
feed the recoil rope through the rope guide.
1
1
1. Recoil handle
2. Rope guide
3. Adjustment lever nut
5
Use
2
3
Figure 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents