Installation; Unpacking The Gateway; Tools Needed - Mellanox Technologies BX4000 Series Quick Start Manual

Top-of-rack gateway
Table of Contents

Advertisement

BX 4000 Sereies Quick Start Guide
RS232 – RJ45 to DB9 cable
CD
Quick Start Guide (this document)

Installation

The gateway platform can be rack mounted for installation in a standard 19" rack. Power side and connector
side are arbitrary, the rack kit can be mounted so that one side is even with the vertical rack support and the
other side is recessed into the rack.

Unpacking the Gateway

Before you install your new MTB4010B-PC, unpack the system and check to make sure that all the parts
have been sent, check this against the parts list. Check the parts for visible damages that may have occurred
during shipping.
Note: If anything is damaged or missing, contact your customer representative immediately.
Minimum and Maximum Rack Depth for this Gateway
This gateway can go into a 19" rack whose vertical supports are between 550mm and 800mm apart.

Tools needed

2 Phillips screwdrivers one small, one medium
ESD Strap
ESD mat
Parts included in the installation kit:
2 rails
1 right hand rail slide
1 left hand rail slide
16 recessed flat head screws
Note: There may be more screws in the kit than are required for installing the gateway.
4 pan head screws
2 metal washers
4 sets of caged nuts and bolts for the mounting plates
Rev 1.5
Mellanox Technologies
6

Advertisement

Table of Contents
loading

Table of Contents