Download Print this page

Sub-Zero UC-15I Installation & Operation Manual page 11

Undercounter ice machine
Hide thumbs Also See for UC-15I:

Advertisement

S U B - Z E R O
I C E M AC H I N E
I N S TA L L AT I O N
13)
Prepare sanitizer solution and sanitize
the ice machine according to In Place
Cleaning/Sanitizing Steps 6 and 7 on
page 25.
14)
Put one gallon (4 L) of cold water into a
container that will easily pour under the
lifted water shutters. Refer to page 17 to
identify water shutters. Open shutters
and add one gallon (4 L) of cold water.
Watch for proper drainage.
15)
Press POWER button.
16)
At initial start-up, ice machine will need
approximately 30 minutes to freeze ice
and up to 5 minutes to harvest the ice.
Wait for first cycle of cubes to drop to
ensure proper installation.
I N S T A L L A T I O N S P E C I F I C AT I O N S
Gravity drain model
TOP VIEW
DRAIN
DRAIN
TUBE
1
/
"
8
(3)
1
15
/
"
4
min
(387)
OPENING WIDTH
TOP VIEW
WATER
INLET TUBE
DRAIN
TUBE
FRONT VIEW
I N S T A L L AT I O N
Do not cover the kickplate area.
The unit must be allowed to have ventilation
through these fins. The door panel may hang
in front of the fins, but a decorative kickplate
must not cover the fins.
The kickplate can be painted another color, if
you choose. Follow these easy steps:
I N S TA L L A T I O N S P E C I F I C AT I O N S
Pump model
SHUT-OFF
SHUT-OFF
VALVE
WATER
VALVE
INLET
TUBE
SHUT-OFF
SHUT-OFF
VALVE
VALVE
Rough up surface to be painted with fine
grit sandpaper.
Wipe with alcohol to ensure it is clean
and dry.
Use an appliance or industrial grade, oil
base, high gloss enamel paint.
TOP VIEW
WATER
INLET TUBE
DRAIN TUBE
AIR GAP
DEVICE
1
/
"
8
(3)
1
15
/
"
4
min
(387)
OPENING WIDTH
TOP VIEW
AIR GAP
DEVICE
DRAIN TUBE
WATER
INLET TUBE
FRONT VIEW
11

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Uc-15ioUc-15ipUc-15ipo