Table of Contents

Advertisement

Cabinetry

VistaCool systems are typically installed in the base/sink cabinet of sterilization centers� The systems should
always be installed as close to the drain system and cold water supply line as possible� The 1/4" O�D� Tefl on
high temperature tubing will need to run from the output port of the autoclave directly to the VistaCool
system� In many cases, holes will need to be drilled through one or more partitions in order to get the tub-
ing from the autoclave to the VistaCool�
In order to protect the tubing from kinking or damage, grommets have been included with each system�
Many cabinets are constructed of composite wood and some are metal� It's especially important to use the
grommets to line the edges of the drilled holes in metal cabinets to keep the tubing from being damaged�
Simply drill a 7/8" pilot hole through the metal or wood partition then push the smooth plastic grommet
into the holes� Make sure to drill the holes so that the tubing makes a progressively descending angle from
the autoclave to the VistaCool� The hole entering the cabinet where the VistaCool is installed should be
above the top of the tank manifold so the tubing has a natural gravity angle to help prevent pools of liquid
in the tubing�
NOTE:
A 9' length of the high temperature Tefl on tubing is included with each single (V7501) and an 18' length is included
with each double (V7502) VistaCool system� An additional 18' length of Tefl on tubing is available as an accessory
(TU749)� Do not exceed 10' in length for any individual section of tubing between an autoclave and the VistaCool.
Always try to minimize the length of run of tubing to reduce friction and prevent "traps" and pooling in the lines�
© 2000-2015 Vista Research Group, LLC. All rights reserved.
USE 7⁄8"
HOLE SAW
AUTOCLAVE
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

V7502

Table of Contents