Tools And Supplies Needed; Inspect Fireplace And Components; Fireplace System Requirements - Heatilator BIR50-B Installation Manual

Woodburning fireplace
Hide thumbs Also See for BIR50-B:
Table of Contents

Advertisement

C. Tools and Supplies Needed
Before beginning the installation be sure the following
tools and building supplies are available:
Reciprocating saw
Pliers
Hammer
Phillips screwdriver
Flat blade screwdriver
Plumb line
Level
1/2-3/4 in. length, #6 or #8 self-drilling screws
Misc. screws and nails
D. Inspect Fireplace and Components
WARNING! Risk of Fire and/or Explosion!
parts could impair safe operation. DO NOT install dam-
aged, incomplete or substitute components. Keep fi re-
place dry.
Remove fi replace and components from packaging and
inspect for damage.
Vent system components and doors are shipped in
separate packages.
Report to your dealer any parts damaged in shipment.
Read all the instructions before starting the
installation. Follow these instructions carefully
during the installation to ensure maximum safety
and benefi t.
8
Heatilator • Birmingham BIR50-B Installation Manual • 4059-701 • Rev B • 2/6/13
Framing material
Non-combustible sealant
Gloves
Framing square
Electric drill and bits
Safety glasses
Tape measure
Damaged
E. Fireplace System Requirements
The Heatilator fi replace system requirements consist of
the following:
Fireplace
-
Molded brick panels (hearth panel Included with
fi replace, side and back panels sold separately)
-
Firescreen (included with fi replace)
-
Hearth Extension (sold separately)
-
Grate (included with fi replace)
Outside Air System
-
Air Inlet Hood (included with fi replace)
-
Flex (required, sold separately)
Chimney System
-
Attic Insulation Shield (sold separately)
-
Chimney termination cap (sold separately)
Non-combustible fi nish material

Advertisement

Table of Contents
loading

Table of Contents