NA SERIES INSTALLATION INSTRUCTIONS
2. Chase Top
Construct a chase of desired materials maintaining a
minimum 2 air space around the chimney.
3. Termination Cap
Install the chimney sections up through the chase
enclosure. When using a TR344/NATR344 round
termination cap, the uppermost top section of pipe
must extend 6 above the top of the chase collar
to allow installation of the storm collar and
termination cap. See Figure 22.
For installations utilizing a TR342 telescoping
round termination cap, the uppermost chimney
section must be below the top of the chase top,
but not more than 14½ below the top of the chase
top flashing collar. See Figure 23.
07/03
17789 Rev H
23