2.5 Connection to the gas system

If necessary the local Gas supplier should be consulted, at the installation planning stage, in order to establish
the availability of an adequate supply of gas.
An existing service pipe must not be used without prior consultation with the Local Gas supplier.
A gas meter can only be connected by the Local Gas supplier, or by a Local Gas suppliers Contractor.
Installation pipes should be fitted in accordance with BS6891-1988.
Appliance inlet working pressure must be 20mbar MINIMUM, for NG and 37 mbar minimum for LPG.
Pipework from the meter to the combination boiler must be of an adequate size.
The boiler requires 2.73m
Do not use pipes of a smaller size than the combination boiler inlet gas connection.
The complete installation must be tested for gas soundness and purged as described in BS6981-1988. All
pipework must be adequately supported. An isolating gas valve is provided and should be fitted on the boiler
gas inlet. Please wait 10 minutes when lighting from cold before checking gas rate. Gas pressures should be
checked after the boiler has operated for 10 minutes to reach thermal equilibrium.

2.6 Condensation discharge connection

The boiler must be connected to the condensation discharge siphon, supplied as standard with the appliance.
1) Take out the flexible grey condensation discharge pipe A, already mounted in the boiler, from the proper
slot on the bottom;
2) Place the siphon on the wall, fix it to the wall with a screw + plug through the fixing point B;
3) Connect the grey pipe A to the hose connector E on the top of siphon, cutting it to the right length if
necessary;
4) Connect the corrugated pipe C to the bottom connector D;
5) Before definitively connecting the corrugated pipe C to the drainage system, fill the siphon with about 0,5
litres of water
D
C
14
3
/h of natural gas, and 2,00 kg/h of LPG.
E
B
A
Fig. 9
ARENA 30 C
Attention:
Attenzione:
Fill the siphon with
Riempire il sifone con
water before con-
a c q u a
p r i m a
d i
necting
collegarlo

Advertisement

Table of Contents
loading

Table of Contents