Expansion Vessel Recharging & Replacement; Boiler Sealing Panel Seal Replacement - IDEAL Independent C24 Installation And Servicing

Hide thumbs Also See for Independent C24:
Table of Contents

Advertisement

72 ExpaNsION VEssEL REChaRgINg & REpLaCEMENT
REChaRgINg
1. Refer to Frame 45.
2. Remove the charge point cover.
3. Recharge the tank pressure to 0.75 bar.
4. Re-assemble in reverse order
5. Check operation of the boiler. Refer to Frames 34
& 35.
REpLaCEMENT
6. Refer to Frame 45.
7. Drain the boiler CH circuit. Refer to Frame 60.
8. Unscrew the union nut on the vessel water
connection pipe.
9. Support the expansion vessel and unscrew the 2
screws from the securing clamp, located on the top
of the boiler, and remove. (Note the position of the
bracket on the vessel)
10. Remove the expansion vessel.
11. Fit the new expansion vessel.
12. Reassemble in reverse order.
13. Refill the boiler.
14. Check operation of the boiler. Refer to Frames 34
& 35.

73 BOILER sEaLINg paNEL sEaL REpLaCEMENT

1. Refer to Frame 45.
2. Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3. Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to
Frames 34 & 35.
Note. Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
50
sERVICINg
8
Recharge
Point
9
Independent -
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Independent c30Independent c35

Table of Contents