Installation; Preliminary Operations; Opening The Package; Checking The Markings - Eneo EKR-8/4 Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

3 Installatio n
The following procedures should be carried out before connecting to the power supply, unless indicated
otherwise.
Installation should only be carried out by skilled, authorised technicians. Incorrect connection of the
various peripherals may lead to isolation of the video switcher from the whole system.
3.1 Prelimina ry operations
3.1.1 Opening th e package
If the package has no obvious defect due to dropping or abnormal scrapes and scratches, check the materials it
contains with the list supplied in Section 1.1 Contents of the package.
The installer technician will be responsible for disposing of the packaging material by recycling or, in any case,
according to the current legislation in the country of use.
3.1.2 Checking th e markings
Before starting installation, check the identification plates to make sure the supplied material
corresponds with the required specifications, as described in Section 1.5 Identification data. Never, under any
circumstances, make any changes or connections that are not described in this manual: the use of inappropriate
devices may be very hazardous for the safety of people and the system itself.
3.2 Installatio n example
MATERIAL USED:
Video management:
2 monitors
2 cameras
1 video matrix EKR-16/4
Control keyboards:
1 MTC-1 control keyboard
Alarm sensor
Telemetry management:
1 Receiver DTRX3 with DTCOAX board
1 DTMRX1 receiver
1 Pan&Tilt motor PTH910P
1 Pan&Tilt motor PTH910
PC
Pag. 6
MNNAEKR_0408

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ekr-16/4

Table of Contents