Potterton Isis HE Installation, Operation & Maintenance Manual page 34

Table of Contents

Advertisement

6.0
OPERATIONAL SAFETY CHECKS
6.1
Check control stat operation
6.2
Check limit stat operation
6.3
Check high/low stat operation
6.4*
Check for gas leaks
6.5*
Check for gas leakage past valve assembly
6.5¶
Check for oil leaks
6.6
Check boiler locks out on loss of flame signal
Check boiler locks out on air pressure switch
6.7
operation
Check boiler locks out on all other safety
6.8
functions
6.9*
Check gas booster interlocks operational
Record INLET and OUTLET pressure switch settings:-
6.10
INLET ....................... OUTLET .....................
7.0
BOILER/SYSTEM CHECK LIST
7.1
Control stat left at
7.2
Limit stat left at
7.3
High/low stat left at
7.4
Maximum flow temperature recorded
7.5
Maximum return temperature recorded
7.6
Boiler water pressure
7.7
Are pipework connections as per manual?
Is safety valve fitted?
7.8
If so, SIZE _________________________
PRESSURE RATING ___________________
7.9
Are water isolating valves fitted?
7.10
Are water flow switches fitted?
7.11
Are return water shut off or diverter valves fitted?
7.12
Is shunt pump fitted?
7.13
Is pump overrun fitted?
Flue type and diameter of connection to boiler:-
TYPE ........................... DIAMETER (mm) ............
Where appropriate and for multi boiler installations
7.14
sketch details of flue system showing length of runs
and diameters.
Conventional
Fan Assisted
Approximate overall height ................................ m
Is the fan interlocked with the boiler?
Are flue dampers fitted?
7.15
If so, interlocked?
7.16
Fan assisted ventilation?
7.17
Any evidence of condensate formation?
7.18
Any evidence of water leakage?
7.19
Any evidence of flue gas leakage?
7.20
Has boiler been built and cased correctly? YES / NO
Is gas service cock installed?
7.21*
If so, accessible?
7.22¶
Is oil filter fitted?
7.23¶
Is fire valve fitted?
Oil supply:
Single Pipe
7.24¶
Two Pipe
Ring Main
Baxi Heating Ltd.
Reg.Office: Pentagon House, Sir Frank Whittle Road,
Derby DE21 4XA – Registered in England 3879156
8.0
9.0
°C
°C
°C
°C
°C
FINDINGS
Is the installation safe for use?
If the answer is NO, has a warning label been
raised?
Is any remedial work required?
Have warning labels been fitted?
Has RIDDOR form been raised?
Flue Dilution
Customer Signature:
YES / NO
YES / NO
Print Name:
YES / NO
YES / NO
Date:
YES / NO
YES / NO
ENGINEER DETAILS
YES / NO
NAME
YES / NO
COMPANY
YES / NO
YES / NO
SIGNATURE
YES / NO
DATE
COMMENTS ON ACCESSIBILITY FOR MAINTENANCE
NOTES & COMMENTS BY COMMISSIONING
ENGINEER
Document ID Ref: PCF/029/3
YES
NO

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents