NAT GAS/L.P.G./OIL (KEROSENE & CLASS D) BOILER/BURNER SITE VISIT/COMMISSIONING REPORT IN ACCORDANCE WITH BS5750
Brooks House, Coventry Road, Warwick CV34 4LL
Tel: 08706-050607 Fax: 08706-001516
REPORT No: ..........................................................
SITE ADDRESS: ...................................................
................................................................................
................................................................................
................................................................................
................................................................................
1.0
BOILER
1.1
Type:
1.2
No of Sections:
Boiler
1.3
No/Position:
1.4
Serial No:
1.5
Fuel:
2.0
BURNER
2.1
Type:
2.2
Serial Number:
2.3
Spec Number:
2.4
Control Box Type:
2.5
Electrical Supply:
2.6*
Gas Train Type & Size:
2.7*
Gas Train Serial No:
2.8*
Gas Booster Type & Size:
2.9*
Gas Booster Serial No:
3.0
BURNER SETTINGS
3.1
Draught Tube Diameter
3.2
Draught Tube Projection
3.3
Diffuser Diameter
Diffuser Setting
3.4
(Distance from end of draught tube)
Gas Nozzle:
3.5*
Oil Nozzles:
3.5¶
Electrode Settings?
3.6
(to burner card/manufacturers instructions?)
Burner to Specification?
3.7
(to burner card/manufacturers instructions?)
NOTE: It is the installers responsibility to ensure that the boiler is correctly commissioned by a competent engineer and that this report is completed
and kept as a record. A commissioning service available from Potterton at the address listed on the back page of this manual. When a Potterton
engineer commissions, this completed report will be sent to the installer. it is the installers responsibility to action any points arising. Commissioning
by Potterton engineers is restricted to equipment of our supply. No responsibility is accepted for the on site assembly or installation of the equipment
unless specifically carried out by Potterton. The installer must ensure that the boiler is installed in accordance with the manufacturers instructions
and all relevant BS Codes of Practice and Regulations (see manufacturers instructions for full details). Items 4.1 to 4.6 are related to the boiler
installation and as such these pre-commissioning checks should be carried out in the presence of the installer.
Potterton is a Member of the Boiler & Radiator Manufacturers Association (BARMA), and the terms of this Commissioning Document follow the
generally agreed conditions of the Association. Potterton, in line with it's policy of continuous product development, reserves the right to alter
and amend this Document as is deemed necessary at any time.
RH
LH
Side
No of Holes
Diameter
End
No of Holes
Diameter
High Fire
Size
Type
Low Fire
Size
Type
REPORT SENT TO
INSTALLER:
SITE VISIT
Date:.......................................................................
Signature: ..............................................................
INSTALLER NAME & ADDRESS:..........................
...............................................................................
...............................................................................
...............................................................................
...............................................................................
COMMISSIONING DATE: .....................................
4.0
PRE-COMMISSIONING CHECKS (See Note)
4.1
Is boiler house ventilation as per manual?
Electric supply fused, isolated & earth wire
4.2
connected?
Centre
4.3
Check external controls allow operation
Check boiler/system flooded and pumps
4.4
operational and any isolation valves open
4.5*
Check gas available at burner
4.5¶
Check oil available at burner
4.6*
Check gas meter sizing adequate
4.7
Check flue system clear
5.0
COMBUSTION
5.1*
Gas rate
Burner Head
5.2*
Pressure
Ionisation Probe/UV
5.3*
Cell Current
5.4
Air Shutter Position
5.5¶
Oil Pump Pressure
5.6
CO2 or O2
mm
5.7*
CO
mm
5.8¶
Smoke Number
mm
Gross Flue Gas
5.9
Temperature
mm
5.10
Ambient Temperature
5.11
Flue Draught
mm
Inlet Gas Pressure (high fire). If multi
5.12*
boiler installation, inlet gas pressure
all boilers high fire.
mm
5.13
Combustion Chamber Resistance
5.14
Burner Fan Static Pressure
NOTE: Normally 5.13 and 5.14 only recorded when tappings
provided. Position of measurement to be in accordance with
boiler and/or burner manufacturers instructions.
*
GAS FIRED INSTALLATIONS ONLY
OIL FIRED INSTALLATIONS ONLY
YES
NO
COMMISSIONING
Pilot
Low
High
m³/hr
mmwg
uA
-
bar
%
ppm
-
°C
°C
mmwg
mmwg
mmwg
mmwg