Cafco Blaze Preparation - Potterton Isis HE Installation, Operation & Maintenance Manual

Table of Contents

Advertisement

POTTERTON COMMERCIAL PRODUCTS DIVISION
INSTALLATION, OPERATION & MAINTENANCE MANUAL
ISIS HE

Cafco Blaze Preparation

The Cafco Blaze compound is supplied in nominal 2kg packages. The compound should gradually be mixed
with water until pliable. The Cafco Blaze absorbs approximately 2 litres of water per kilogram.
Table. 5 – Insert Dimensions
No of Sections
L = Overall Length
D = Major Diameter
d = Minor Diameter
A = Major Diameter Length
B = Minor Diameter Length
d
Fig.18 – Insert Position
FLUEWAY
INSERT LEGS
IMPORTANT The insert must be placed
central in the flueway
6
7
8
945
1125
1315
60
60
55
60
60
50
455
635
615
490
490
700
L
B
INSERT
9
10
11
1315
1665
1665
55
60
60
50
54
54
615
1165
1165
700
500
500
A
Fig.19 – Insert Position
INSERT
COMBUSTION
CHAMBER
INSERT
IMPORTANT The insert must be inserted fully
to the rear of the flueway
SECTION 4
PAGE 19
12
13
14
2025
2025
2385
55
55
50
50
50
44.5
1325
1325
1685
700
700
700
FLUE
15
2385
50
44.5
1685
700
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents