Electrical Connections - IDEAL HE24 Installation And Servicing

Hide thumbs Also See for HE24:
Table of Contents

Advertisement

32
FILLING
Central Heating
1. Remove the front panel. Refer to
Frame 45.
2. Ensure that the CH isolating
valves are open.
3. Fill and vent the system using the
filling loop, fitted between the DHW
inlet valve and the CH return valve.
Refer to Frame 31 and Frame 4 for
setting pressure.
Check for water soundness.

33 ELECTRICAL CONNECTIONS

WARNING. This appliance MUST be earthed.
A mains supply of 230 V ~ 50 Hz is required.
The fuse rating should be 3A. All external controls and wiring
must be suitable for mains voltage.
Wiring external to the boiler MUST be in accordance with the
current I.E.E. (BS.7671) Wiring Regulations and any local
regulations.
For IE reference should be made to the current ETCI rules for
electrical installations.
34 ELECTRICAL CONNECTIONS - INSTALLER WIRING
The Esprit boiler comes pre-fitted with 1m of mains cable.
This must be connected to a permanent live supply and NOT
switched by thermostats/programmers. For installers
wishing to change this cable refer to Frame 35.
The Esprit boiler comes pre-fitted with a link wire between R1
and R2 on the terminal strip. This creates a permanent call
for heat and must be removed when adding a room
thermostat/programmer.
To add thermostat/programmer:
1. Isolate the mains supply to the boiler.
2. Remove the front panel. Refer to Frame 45.
3. Swing the control box down into the servicing position.
Refer to Frame 46.
4. Remove the terminal block cover to access the terminals
for electrical connections.
30
INSTALLATION
IMPORTANT - when filling:
A. Ensure dust cap on auto air vent is
opened up one full turn.
B. When filling, there may be a slight
water leak from the air vent therefore
electrical connections should be
protected.
Domestic Hot Water
1. Fully open all DHW taps and ensure
that water flows freely from them.
2. Close all taps.
4
esp8854
LEGEND
L
Live
N
Neutral
F1
Frost Thermostat Switched Live
F2
Frost Thermostat Live Feed
R1
Room Thermostat Switched Live
R2
Room Thermostat Live Feed
R3
Room Thermostat Switched Live
(When using optional internal programmer kits)
A
Note. The domestic hot water flow rate is
automatically regulated to a maximum:
HE24 = 9.6
HE30 = 12.0
HE35 = 14.4
Wiring should be 3 core PVC insulated cable, not less than
0.75 mm
(24 x 0.2mm) and no greater than 1.25mm
2
to BS 6500 Table 16.
Connection must be made in a way that allows complete
isolation of the electrical supply such as a double pole
switch having a 3mm (1/8") contact separation in both
poles, or an unswitched plug and socket, serving only the
boiler and system controls. The means of isolation must
be accessible to the user after installation.
5. Route incoming cables through cable glands provided,
after removing air sealing plugs.
6. Connect wires to terminal block, see instructions
opposite.
7. Re-fit terminal block cover, nibbling out the plastic as
required from the cable entry to secure the cables.
8. Tighten cable gland to provide cable anchorage.
9. Swing the control box back up into the operating condition
and re-fit the front panel ensuring a good seal is made.
l/m
(2.1 gpm)
l/m
(2.6 gpm)
l/m
(3.2 gpm)
, and
2
Pre fitted link wire
Pre fitted
mains cable
esp9189
Esprit -
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He35He30

Table of Contents