Velux TFF 200 Directions For Use Manual page 8

Solar hot water unit
Table of Contents

Advertisement

SECTION I: TANK INSTALLATION
Typical discharge pipe arrangement
Safety device
(eg. temperature relief value).
500 mm maximum
300 mm minimum
Metal discharge pipe (D2) from tundish, with
continuous fall.
See Building Regulation G3 section 3.9d i-iv,
Tabel 4 and worked example.
2.3.1 Sizing of copper discharge pipe 'D2' for common temperature relief valve outlet sizes
Valve
Minimum size of
outlet size
discharge pipe D1*
15 mm
22 mm
G1
28 mm
8 VELUX
Metal discharge pipe (D1) from temperature relief
valve to tundish.
Tundish
Minimum size of
Maximum resistance allowed,
discharge pipe
expressed as a length of straight
D2* from tundish
pipe (ei. no elbows or bends)
22 mm
28 mm
35 mm
28 mm
35 mm
42 mm
35 mm
42 mm
54 mm
Discharge below fixed grating
(Building Regulation G3 section
3.9d gives alternative points of
discharge).
Resistance created by
up to 9 m
up to 18 m
up to 27 m
up to 9 m
up to 18 m
up to 27 m
up to 9 m
up to 18 m
up to 27 m
Fixed louvred grating
Trapped gully
each elbow or bend
0.8 m
1.0 m
1.4 m
1.0 m
1.4 m
1.7 m
1.4 m
1.7 m
2.3 m

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TFF 200 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Tff 300Tff 400 0201

Table of Contents

Save PDF