Gas Connection - IDEAL HE24 Installation And Servicing

Hide thumbs Also See for HE24:
Table of Contents

Advertisement

26 WATER CONNECTIONS - DHW
Note. The DHW inlet
isolating valve incorporates
a flow regulator / filter. It should
be inspected to ensure no blockage
is evident.
1. To remove, turn off the valve, undo the
retaining screw and pull out the filter
by grasping the crossbar with pliers.
2. Reassemble in reverse order,
inserting in the direction of the arrow.

27 GAS CONNECTION

IMPORTANT. The gas service cock contains a
non-metallic seal so must not be overheated
when making capillary connections.
Refer to Frame 2 for details of the position of the
gas connection.
The principle of the 1:1 gas valve ensures that
the isar range is able to deliver its full output at
inlet pressures well below those required by
BS. 6891.
A boiler gas supply pipe length of 20m and not
less than 15mm O.D. can be connected to the
boiler via the gas service cock union.
Ensure that the gas supply pipe does not foul
the boiler casing.
Refer to Frame 36 or 'Servicing' for details of the
pressure test point position.
isar -
Installation and Servicing
INSTALLATION
Retaining
Outlet
screw
connector
15mm copper pipe
D.H.W. Outlet
Gas cock
(shown in the
open position)
Cross bar
'O' Ring
Regulator / Filter
Isolating valve
(shown in the
open position)
15mm copper pipe
D.H.W. Inlet
Rubber seal
GAS IN
Piping frame
Piping
frame
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He35He30Isar

Table of Contents