6.3.3. Wiring procedure
When connecting the power supply cable, make sure that the phase of the power
supply matches with the phase of the terminal board. If the phases do not match, the
compressor will rotate in reverse and will not be able to compress.
(1) Service cover removal
• Remove the two mounting screws.
• Remove the service cover by pushing downwards.
Direction of the
service cover
removal
(2) Valve cover removal.
• Remove the one mounting screw.
• Remove the valve cover by sliding upward.
(3) Connect the power supply cable and the connection cable to terminal.
(4) Fasten the power supply cable and connection cable with cable clamp.
Terminal blocks
Cable clamp
Firmly secure
cable clamp so
wire terminations
will not receive
external stress.
Connection cable
EARTH
(5) Power supply cable and connection cable should be fixed with cable clip as shown in
the figure.
Fill in a gap at the entrance of the cables with insulation (seal).
Cable clip
En-9
CAUTION
Hook (3 places)
Service cover
Valve cover
Hook (4 places)
Control box
Cable clamp
Use the specified
wire type and
connect it securely.
Power supply cable
Indoor
unit
Power supply cable and connection cable
Insulation
(Seal)
Fix cables so that cables do not make contact with the pipes (especially on high
pressure side).
Do not make power supply cable and connection cable come in contact with valve
(Gas).
Valve
(Gas)
(6) Put the service cover and valve cover back after completion of the work.

7. PIPE INSTALLATION-2

Installing insulation
Determine the thickness of the insulation material by referring to Table A.
Table A, Selection of insulation
(for using an insulation material with equal heat transmission rate or below
0.040 W/(m·k))
Relative humidity
[mm (in.)]
9.52 (3/8)
Pipe diameter
15.88 (5/8)
If the ambient temperature and relative humidity exceed 32 °C, increase the level of
heat insulation for the refrigerant pipes.

8. TEST RUN

Always turn on the power 12 hours prior to the start of the operation in order to ensure
compressor protection.
Make a TEST RUN in accordance with the installation instruction sheet for the indoor unit.
CAUTION
Power supply cable
and connection cable
Insulation material
Minimum thickness [mm]
70%
75%
80%
or more
or more
or more
9
11
14
10
12
16
CAUTION
85%
or more
18
20